1、evaluation of scientific development. nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. quality and efficiency-quality benefit is to adhere to the
3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. in
4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and
5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance
6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. harmonious development of harmoni
7、ous development-is to construct a foreign environment for development. xing refers to the internal security firm and internal management of the internal management measures are effective, harmonious. foreign currency means enterprise coordinating development of homeopathy, well, get along with the n
8、eighbors better. (b) xx 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. class of disorders 0, 0 is equivalent forced outage rate. no personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden
9、t. enterprise integrated to achieve zero cases of violation, zero accidents, zero. quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kwh, total profits of 306.6 million yuan, . bfs+、pi、mis、scm information systems infrastructure, fully integrated information s
10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of enterprise management assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr
11、aining電 儀 施 工 方 案 編 制 人: 審 核 人: 批 準(zhǔn) 人:中石化工建設(shè)有限公司2012年07月14日supervision in large and medium goods vehicle. a is established large vehicles and small vehicles classification management of motor vehicle test mode, increased medium van car, and dangerous goods transport car, and school car test project;
12、 ii is established motor vehicle test regulatory platform, achieved motor vehicle test full process video, and data remote regulatory; three is strictly motor vehicle identification management, equipped with unified of identification equipment and tool, using mobile identification terminal, and law
13、enforcement records instrument, technology identification means. as to 20xx years june 20 statewide motor vehicle keep volume for 567,408 car, and last year earlier than growth 75,814 car, growth 13.36%; this year january-june, vehicles management section and license archives management section tota
14、l accepted the motor vehicle registration business 42,543 car times, which registered registration 6,905 car times, and transfer registration 3,592 car times, and change registration 1033 car times, and mortgage registration 696 car times, and cancellation registration 187 car times, and into busine
15、ss 980 car times, and archives corrections 81 pieces times, and issued test qualified logo 25,429 car times, and other vehicles business 3,640 car times; supervision survey section relies on motor vehicle detection remote issued test qualified logo software platform supervision motor vehicle test, a
16、nd identification situation 7418l liangci, investigation motor vehicle exception business 30 car times, his pards business warning 244 article, vehicles and driving people sound video regulatory screenshots 1852 zhang, checks motor vehicle archives 716 pieces times, and medium bus, and medium above
17、truck, and of hazardous chemicals, vehicles and school buses and other key vehicle inspection record of 420. (c) based on their own, and strict adherence to defense, more cheating, false false fugitive suspects, robbery suspect vehicles and the internet crackdown. dmv full play to the first line of
18、defense position control, investigating cheating, fake identification and robbery suspect vehicles through operational work, and carefully examine the documents and legal proof, check traffic violations, traffic accidents, the fugitive suspect suspected vehicles and theft than to work, further tight
19、 car, driving management business formalities review procedures. . truck driver information management platform. motor vehicles and traffic police departments, state transport authority to further clarify the division of labour, implementation responsibility, strengthen our collaboration and managem
20、ent together, reinforcing the management of drivers on which strongly synthetic warfare and information warfare. 3 strictly implemented. from may 1 up, a is implemented complex road and bad weather driving exam, currently dmv is urged contractors party in treasures driving school increased simulatio
21、n highway, and continuous urgent detours, and snow days, and wet sliding road, and burst situation disposal, subjects ii field to driving exam project, is expected 第 1 頁(yè)80萬(wàn)噸/年汽油加氫裝置改造項(xiàng)目及30萬(wàn)噸/年輕汽油醚化裝置項(xiàng)目 電儀施工方案目 錄一、工程概況和編制依據(jù). 2二、電氣施工. 5三、儀表施工. 18四、雨季施工技術(shù)措施. 34 五、質(zhì)量保證措施. 37 六、安全防護(hù)的保證措施. 45 七、文明施工措施. 51
22、八、環(huán)境保護(hù)措施. 55九、成品保護(hù)措施. 60 第一章 工程概況和編制依據(jù)一. 工程概況1工程名稱:80萬(wàn)噸/年汽油加氫裝置改造項(xiàng)目及30萬(wàn)噸/年輕汽油醚化 裝置項(xiàng)目2工程地址:山東昌邑石化廠區(qū)內(nèi)3工程范圍:電氣及儀表安裝工程。4工程質(zhì)量標(biāo)準(zhǔn):優(yōu)良。5工程量范圍 電氣工程:變配電工程、電動(dòng)配線工程、照明工程、接地工程組成。 儀表工程:儀表控制工程、控制電纜敷設(shè)工程、遠(yuǎn)傳儀表及就地儀表安裝工程、盤(pán)柜校接線工程、接地工程組成。6. 主要工程量 電氣工作量:電纜橋架安裝、照明安裝、動(dòng)力及其它控制盤(pán)柜安裝、電機(jī)操作柱安裝、電力電纜安裝、電機(jī)檢查接線、照明燈具安裝、接地極安裝、接地線安裝等。 儀表工作
23、量:槽式直通橋架安裝、控制電纜保護(hù)管安裝、氣源管及引壓管及伴熱管安裝、遠(yuǎn)程儀表及就地儀表安裝、控制電纜敷設(shè)、儀表接線、盤(pán)柜校接線、及儀表聯(lián)校等。7. 線路敷設(shè)方式:本裝置變電所及控制室內(nèi)及裝置區(qū)的電纜配線均采用電纜橋架敷設(shè)方式,電纜出橋架后穿鋼管敷設(shè)至電儀設(shè)備。防爆電儀設(shè)備的進(jìn)線口處均安裝有密封件,使內(nèi)部與外界空氣隔離,防止爆炸氣體的侵入。二編制依據(jù)1施工圖紙電氣施工圖一套及儀表施工圖一套2標(biāo)準(zhǔn)規(guī)范gb50150-91 電氣設(shè)備交接試驗(yàn)標(biāo)準(zhǔn)gb50166-92 火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收規(guī)范gb50168-92 電氣裝置安裝工程電纜線路施工及驗(yàn)收規(guī)范gb50169-92 電氣裝置安裝工程接地裝
24、置施工及驗(yàn)收規(guī)范gb50170-92 電氣裝置安裝工程旋轉(zhuǎn)電機(jī)施工及驗(yàn)收規(guī)范gb50171-92 電氣裝置安裝工程盤(pán)、柜及二次回路結(jié)線施工及驗(yàn)收規(guī)范gbj147-90 電氣裝置安裝工程高壓電器施工及驗(yàn)收規(guī)范gbj148-90 電氣裝置安裝工程電力變壓器、油浸電抗器、互感器施工及驗(yàn)收規(guī)范gbj149-90 電氣裝置安裝工程母線裝置施工及驗(yàn)收規(guī)范gb50093-2002 自動(dòng)化儀表工程及驗(yàn)收規(guī)范sh/t3521-2007石油化工儀表工程施工技術(shù)規(guī)程gbj13190 自動(dòng)化儀表安裝工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn) 第二章 電氣施工一施工準(zhǔn)備與施工程序 施工前認(rèn)真熟悉圖紙,做好圖紙會(huì)審工作,并以設(shè)計(jì)圖紙為指導(dǎo),標(biāo)
25、準(zhǔn)規(guī)范為依據(jù),對(duì)到貨的設(shè)備和材料進(jìn)行認(rèn)真檢查。施工中注意與土建、工藝及機(jī)械等專業(yè)的交叉作業(yè),施工程序框圖如下:二施工方法及質(zhì)量要求1防雷防靜電接地工程 接地母線的敷設(shè)與連接 接地溝開(kāi)挖時(shí),盡量按設(shè)計(jì)圖成直線開(kāi)挖,并注意不得損壞地下已施工完畢的設(shè)施,結(jié)合原裝置接地圖找出原接地網(wǎng)位置并連接,接地極要垂直安裝,接地極頂部距地面大于0.7m,相鄰的接地極間距不小于5m。 接地線與接地極、接地線之間的連接采用搭接,搭接長(zhǎng)度大于扁鋼寬度的2倍,且至少三面焊接,焊接要均勻、飽滿無(wú)虛焊,所有焊道處必須敲藥皮刷防腐瀝青漆。 每條接地干線確保在不同的兩點(diǎn)以上與接地網(wǎng)相連,電氣裝置和工藝設(shè)備要以單獨(dú)的接地線與接地干
26、線相連,不允許在一個(gè)接地線中串接多個(gè)需要接地的設(shè)備。 接地回填時(shí),回填土中不應(yīng)夾有石塊等大顆粒物,回填要分層夯實(shí)。 引出地面的接地線要先找正,并確定出線位置的正確再回填?;靥钋皽y(cè)試接地電阻,若大于設(shè)計(jì)值,采用增加接地極的方法降低接地電阻,由業(yè)主、監(jiān)理現(xiàn)場(chǎng)檢查合格簽字認(rèn)可,并做好隱蔽工程記錄。 接地支線與設(shè)備連接 整個(gè)裝置區(qū)內(nèi)工作接地與保護(hù)接地嚴(yán)格分開(kāi)。 接地支線與電氣設(shè)備(如電機(jī)、變壓器、照明箱、配電箱等)采用鍍鋅螺栓連接,搭接面刮漆涂導(dǎo)電膏。 接地支線與塔、容器類采用斷接卡子連接,斷接卡子中心高度一致機(jī)械鉆孔,并用鍍鋅螺栓連接。 新增框架接地由接地支線沿框架引上,固定點(diǎn)間距符合要求,接地線在
27、鋼筋混凝土梁柱上安裝采用塑料脹錨螺栓固定,接地線在金屬框架上采用焊接固定。2照明工程 照明工程待設(shè)備、工藝管道基本安裝完畢后進(jìn)行,避免損壞浪費(fèi)。利舊照明燈具和照明線路應(yīng)測(cè)試絕緣電阻,并測(cè)試其是否通路。 照明配管應(yīng)整齊美觀,成排、成列安裝的照明燈具、開(kāi)關(guān)、插座的中心軸線、垂直度偏差、距地面高度應(yīng)符合設(shè)計(jì)和規(guī)范要求。 鋼管間和鋼管與電氣設(shè)備、接線盒、燈位盒、隔離密封盒、防爆找性連接管間的螺紋連接處應(yīng)符合要求。 鋼管配線在照明箱進(jìn)線口處應(yīng)裝設(shè)隔離密封盒,并做好隔離密封。 鋼管配線的電氣設(shè)備,其進(jìn)線口多余的備用線孔采用合適的密封墊封堵,防爆燈具、接線盒等密封圈應(yīng)完好無(wú)損,安裝正確。 導(dǎo)線穿管時(shí)在管內(nèi)不
28、允許有接頭,多根導(dǎo)線其外皮盡量采用不同顏色,以區(qū)別其不同用途。 火線進(jìn)開(kāi)關(guān),零線直接接燈座螺口。照明電源線的分布要考慮三相平衡。3電纜施工 電纜保護(hù)管預(yù)制安裝 電纜保護(hù)管的煨制采用電動(dòng)液壓煨彎?rùn)C(jī)冷煨,dn70以上鍍鋅鋼管彎制采用自制胎具加工方法,切割采用電動(dòng)無(wú)齒切割機(jī)。 保護(hù)管彎制時(shí),其彎曲半徑和彎扁程度要符合規(guī)范要求。切割后管口要打磨毛刺,并視情況做成嗽叭形。鍍鋅管鋅層肅落處涂防腐漆。 明敷電纜管橫平、豎直,并做適當(dāng)?shù)闹С止潭?,支持點(diǎn)距離不能超過(guò)3米。與各種管道距離符合規(guī)范要求,并列安裝排列一致,管口平齊。 所有電纜保護(hù)管均應(yīng)可靠接地,防爆場(chǎng)所保護(hù)管連接必須用防爆管件。 電纜穿鋼管并接線完后
29、,管口處應(yīng)封堵防爆膠泥。 電纜橋架施工 本裝置部分電纜采用沿橋架敷設(shè)方式,電纜橋架采用槽鋼或角鋼固定,支架焊接牢固,無(wú)明顯變形。 在需要對(duì)橋架尺寸加以修改時(shí),嚴(yán)禁使用火焊電焊切割橋架,應(yīng)用鋸弓、無(wú)齒鋸等工具進(jìn)行加工,對(duì)涂層破壞處應(yīng)涂與原橋架顏色相同的涂料。 電纜敷設(shè) 電纜檢查驗(yàn)收:根據(jù)施工圖紙核對(duì)到貨電纜的規(guī)格、型號(hào)、長(zhǎng)度是否符合要求,并檢查有無(wú)合格證和產(chǎn)品質(zhì)量證明書(shū)等產(chǎn)品技術(shù)文件。 敷設(shè)準(zhǔn)備:認(rèn)真審核圖紙,根據(jù)配電系統(tǒng)圖和電氣設(shè)備平面布置圖確定電纜表的正確性。依據(jù)現(xiàn)場(chǎng)盤(pán)柜、設(shè)備位置及電纜溝布置核算出電纜實(shí)際長(zhǎng)度,確定設(shè)計(jì)提供的電纜在電纜溝內(nèi)排列圖的正確性。安排相關(guān)人員進(jìn)行電纜的絕緣、通路檢查
30、,對(duì)于高壓電纜還要做直流耐壓試驗(yàn)。根據(jù)實(shí)際電纜敷設(shè)特點(diǎn)確定相應(yīng)的吊車、人員及放纜機(jī)具。并對(duì)有關(guān)人員進(jìn)行技術(shù)交底 電纜敷設(shè):電纜敷設(shè)前,將橋架、電纜溝、電纜保護(hù)管以及電纜豎井等清理干凈。敷設(shè)時(shí)電纜兩端貼上電纜標(biāo)簽,標(biāo)簽上注明電纜型號(hào)、規(guī)格、起點(diǎn)、終點(diǎn)、長(zhǎng)度等,拉電纜用力要均勻,注意不讓尖銳物劃傷電纜,電纜敷設(shè)到位后兩端預(yù)留適當(dāng)長(zhǎng)度。電纜拐彎處的彎曲半徑不小于相應(yīng)電纜的最小彎曲半徑。每根電纜敷設(shè)完要整齊排放,不宜交叉,在拐彎處、首末端和垂直橋架每隔2m處用非導(dǎo)電性材料如塑料綁扎等固定,并及時(shí)在電纜終端頭、拐彎處裝設(shè)電纜標(biāo)志牌。電纜在電纜溝內(nèi)敷設(shè)應(yīng)有適量蛇彎,電纜進(jìn)入電纜溝應(yīng)穿保護(hù)管,室外電纜溝引入
31、室內(nèi)的兩個(gè)終端均應(yīng)用磚和50號(hào)水泥砂漿砌筑成擋砂墻,備用保護(hù)管兩端應(yīng)密封良好。電纜進(jìn)入電纜溝、保護(hù)管、防爆場(chǎng)所電氣設(shè)備時(shí),出入口要用防爆密封膠泥密封嚴(yán)密。直埋電纜過(guò)路或與工藝管道交叉時(shí),加保護(hù)管,電纜上、下各鋪100mm厚細(xì)沙,并蓋磚保護(hù);直埋電纜敷設(shè)由業(yè)主、監(jiān)理進(jìn)行隱蔽工程檢查合格后方可回填,回填土分層夯實(shí)。防爆場(chǎng)所電纜溝內(nèi)充砂,電纜分層埋設(shè),動(dòng)力電纜在上,按制電纜在下。非防爆場(chǎng)所電力電纜和控制電纜布置在不同支架上,高低壓電力電纜、控制電纜由上而下布置,并在適當(dāng)部位做好固定和加掛標(biāo)志牌。 電纜頭制做及接線:電纜敷設(shè)、整理完后,按電纜作業(yè)表認(rèn)真檢查回路、電纜、用電設(shè)備三者是否對(duì)應(yīng)一致,有問(wèn)題及
32、時(shí)調(diào)交。然后用搖表進(jìn)行電纜的絕緣和相位檢查,有問(wèn)題及時(shí)查明處理。由有經(jīng)驗(yàn)的電工進(jìn)行高壓電纜頭的制作,制作時(shí)嚴(yán)格按照熱縮或冷縮頭產(chǎn)品技術(shù)文件的操作工藝進(jìn)行,從電纜剝切到完成要連續(xù)進(jìn)行。施工時(shí)不準(zhǔn)劃傷芯線絕緣,半導(dǎo)體刮除、清擦要干凈。低壓電纜和控制電纜采取干包式,剝切電纜和切除鋼鎧護(hù)層時(shí)不準(zhǔn)損傷線芯和內(nèi)護(hù)套的絕緣,剝切長(zhǎng)度視接線端子位置而定,但不小于規(guī)范要求的線芯絕緣面最小長(zhǎng)度,鎧裝電纜首末端均做接地。統(tǒng)包絕緣時(shí),搭蓋要均勻,無(wú)空隙。 盤(pán)柜內(nèi)電纜都要將芯線打把成束,按橫平豎直的要求走至接線端子,在特設(shè)的固定板上加以固定。接線時(shí)不能使芯線對(duì)設(shè)備接線端子產(chǎn)生額外應(yīng)力,接線要緊固,鋼鎧接地線接于pe母線
33、上。接完線及時(shí)加掛電纜標(biāo)牌,并對(duì)盤(pán)柜的電纜入口做好密封?,F(xiàn)場(chǎng)電氣設(shè)備的接線要保證接線端子安全距離符合規(guī)范要求。對(duì)于動(dòng)設(shè)備接線時(shí)加彈簧墊圈或鎖緊螺母;防爆場(chǎng)院所設(shè)備接線后注意做好密封,使其符合防爆等級(jí)要求;未使用的電纜入口其彈性密封墊和金屬墊片應(yīng)齊全,并將壓緊螺母擰緊使入口密封。在電纜保護(hù)管兩端的管口處,將電纜周圍用非燃性纖維堵塞嚴(yán)密后再填塞密封膠泥,密封膠泥填塞高度不小于管子內(nèi)徑的1.5倍,且不小于50毫米。4配電安裝工程 防爆動(dòng)力配電箱、防爆照明配電箱:配電箱支架牢固端正,位置符合設(shè)計(jì)要求,利舊配電箱應(yīng)測(cè)試其內(nèi)部絕緣電阻,檢查線路通斷,部件齊全、好用,回路編號(hào)清楚,導(dǎo)線與電器氣設(shè)備連接牢固緊
34、密,不傷芯線。接線端子安全距離符合要求,導(dǎo)線進(jìn)入箱體絕緣保護(hù)良好。箱體接地符合要求。箱體防爆密封良好。 防爆自動(dòng)開(kāi)關(guān):自動(dòng)開(kāi)關(guān)垂直安裝,操作手柄與傳動(dòng)杠桿的開(kāi)、合位置應(yīng)正確,操作輕便、觸頭在閉合、斷開(kāi)過(guò)程中,可動(dòng)部分與滅弧室的零件無(wú)卡阻現(xiàn)象,觸頭接觸面平整,合閘后接觸緊密。脫扣裝置按設(shè)計(jì)整定值校驗(yàn),動(dòng)作準(zhǔn)確可靠。箱體接地、防爆密封符合要求。 防爆操作柱:裝置區(qū)內(nèi)成排安裝的操作柱,安裝時(shí)注意排列整齊、美觀,在同一泵房?jī)?nèi)應(yīng)用粉線統(tǒng)一操作柱基礎(chǔ)位置,安裝成一條直線 ,操作柱垂直度偏差不大于3mm,外殼油漆完整、清潔,操作按鈕及轉(zhuǎn)換開(kāi)關(guān)操作靈活、可靠、無(wú)卡阻,操作柱應(yīng)有編號(hào),且安裝位置符合設(shè)計(jì)要求。電
35、動(dòng)機(jī)操作柱設(shè)有電流表時(shí),電流表經(jīng)調(diào)校后指示應(yīng)正確。操作柱上指示燈完好,燈光指示正確。操作柱固定牢固,接地與防爆密封良好。 高低壓配柜:在安裝盤(pán)柜之前,配電間土建工作應(yīng)基本結(jié)束,屋頂、樓板施工完畢,不得滲漏,室內(nèi)地面工作結(jié)束,室內(nèi)溝道無(wú)積水、雜物,門(mén)窗安裝完畢。盤(pán)柜運(yùn)到配電間前先在門(mén)前搭一平臺(tái),再均勻?qū)⒒芘砰_(kāi),把柜吊至平臺(tái)滑杠上,勻速滑動(dòng)至指定位置就位安裝。盤(pán)柜成列安裝時(shí),其垂直度、水平偏差及盤(pán)柜面偏差和盤(pán)柜間接縫應(yīng)符合規(guī)范要求。5變壓器安裝 到貨驗(yàn)收,認(rèn)真檢查,填寫(xiě)開(kāi)箱檢查記錄。 變壓器搬運(yùn)就位,以起重工為主操作,電工配合。采用汽車和吊車。在變壓器室外利用道木墊高,略低于變壓器室地面,利用滾
36、杠就位。 變壓器就位時(shí),注意應(yīng)將高壓側(cè)置外,低壓側(cè)置內(nèi)。變壓器內(nèi)側(cè)距墻不小于800mm,外側(cè)距門(mén)不小于1000mm,適當(dāng)照顧到房頂?shù)趿何挥谧儔浩髦行摹?壓力釋放裝置的安裝嚴(yán)格依照產(chǎn)品說(shuō)明書(shū)進(jìn)行。6電氣試驗(yàn) 電纜試驗(yàn) 絕緣電阻測(cè)量:低壓電纜采用1000v兆歐表,6kv電纜采用2500v兆歐表,控制電纜采用500v兆歐表進(jìn)行測(cè)量。電力電纜由于電容量大,測(cè)量時(shí)搖速要?jiǎng)?。測(cè)量完畢,先斷開(kāi)測(cè)量線,再停止搖表,以免電容電流對(duì)搖表反充電,測(cè)量完畢要充分放電。 直流耐壓及泄漏試驗(yàn)、直流耐壓試驗(yàn)電壓為24kv。電纜泄漏電流在下列情況,絕緣可能存在缺陷,應(yīng)找出缺陷進(jìn)行處理:泄漏很不穩(wěn)定;泄漏電流隨電壓急劇上升;泄
37、漏電流隨時(shí)間延長(zhǎng)有上升現(xiàn)象。試驗(yàn)時(shí)分五個(gè)階段均勻升壓,每一階段停留1min,并讀取泄漏電流。 電纜試驗(yàn)在敷設(shè)前后進(jìn)行,試驗(yàn)前后絕緣電阻不應(yīng)有明顯差別。 檢查線路兩端相位一致,并與電網(wǎng)相位一致。 互感器試驗(yàn) 絕緣電阻測(cè)量:采用2500v兆歐表測(cè)量一次繞阻對(duì)二次繞組及外殼,采用500v兆歐表測(cè)量各二次繞組間及其對(duì)外殼絕緣電阻。 交流耐壓試驗(yàn):包括一次繞組連同套管對(duì)外殼的交流耐壓和二次繞組間及其對(duì)外殼的工頻耐壓試驗(yàn)。電流互感器一次繞組對(duì)二次繞組試驗(yàn)時(shí)二次繞組必須短接,不能開(kāi)路。升壓必須從零開(kāi)始,不可沖擊合閘。升壓速度在40%試驗(yàn)電壓內(nèi)可不受限制,其后均勻升壓升壓速度以每秒3%進(jìn)行遞增。試驗(yàn)分析,若電
38、流突然上升或電壓表突然下降,說(shuō)明被試品擊穿。若試驗(yàn)過(guò)程中有斷續(xù)放電聲、冒煙、閃弧、燃燒等現(xiàn)象,則認(rèn)為被試品存在缺陷或擊穿。試驗(yàn)過(guò)程中,若由于空氣濕度、溫度、表面臟污等原因,引起被試品表面滑閃放電或空氣放電,不應(yīng)認(rèn)為不合格,須經(jīng)清潔干燥處理后,再進(jìn)行試驗(yàn)。 耐壓試驗(yàn)前后測(cè)量絕緣電阻,不應(yīng)有明顯變化。 三相組別檢查:采用直流法檢查三相接線組別,其結(jié)果必須符合設(shè)計(jì)要求,且應(yīng)與銘牌和外殼上的標(biāo)志相符。 極性檢查和變比檢查:被測(cè)互感器所使用的電表及標(biāo)準(zhǔn)互感器的準(zhǔn)確等級(jí),均要比所測(cè)互感器準(zhǔn)確等級(jí)高。 變壓器試驗(yàn) 測(cè)量繞組連同套管的直流電阻、測(cè)量應(yīng)在分接頭的所有位置進(jìn)行。各相測(cè)得值的相互差值應(yīng)小于平均值的4
39、%,線間測(cè)的值相互差值應(yīng)小于2%。直流電阻與同溫下產(chǎn)品出廠實(shí)測(cè)值比較,變化不應(yīng)大于2%。 測(cè)量分接頭所有位置的變比,與制造廠的銘牌數(shù)據(jù)相比應(yīng)無(wú)明顯差別,且符合變壓比規(guī)律。 檢查變壓器三相接線組別,應(yīng)與設(shè)計(jì)要求、銘牌和外殼上標(biāo)志相符合。 測(cè)量電阻連同套管絕緣電阻值不低于產(chǎn)品出廠值的70%,當(dāng)測(cè)量溫度與出廠試驗(yàn)時(shí)溫度不一致時(shí),應(yīng)換算到同一溫度下進(jìn)行比較。 直流耐壓及泄漏試驗(yàn):試驗(yàn)電壓10kv,時(shí)間1min,試驗(yàn)結(jié)果分析同電纜試驗(yàn)。 交流耐壓試驗(yàn):試驗(yàn)電壓21kv,時(shí)間1min。試驗(yàn)分析:耐壓試驗(yàn)后的絕緣電阻比試驗(yàn)前下降30%,則認(rèn)為不合格;在試驗(yàn)過(guò)程中,若由于空氣溫度、濕度、表面臟物等影響,引起被
40、試品表面化滑閃或空氣放電,不應(yīng)認(rèn)為不合格,須清潔干燥處理后再進(jìn)行試驗(yàn)。 絕緣油強(qiáng)度試驗(yàn):平均擊穿電壓不低于25kv。 電動(dòng)機(jī)試驗(yàn) 絕緣電阻和吸收比測(cè)量:額定電壓1000v以上,常溫下絕緣電阻不應(yīng)低于0.5m;額定電壓6kv以上在運(yùn)行溫度下,定子繞組絕緣電阻不低于6 m;6kv電機(jī)吸電比不應(yīng)低于1.2,中性點(diǎn)可折開(kāi)者,分相測(cè)量,如不能滿足要求應(yīng)進(jìn)行干燥處理。 直流電阻測(cè)量:1kv以上及100kw以上的電動(dòng)機(jī)的各相繞組相互差別不應(yīng)超過(guò)其最小值的2%,中性點(diǎn)未引出者,其相互判別不應(yīng)超過(guò)最小值的1%。 交流耐壓試驗(yàn):定子繞組額定電壓6kv,試驗(yàn)電壓10kv,時(shí)間10min。試驗(yàn)時(shí),中性點(diǎn)未引出者,三相
41、同時(shí)施壓,外殼接地;中性點(diǎn)引出者,每相單獨(dú)加壓,另外兩相短接連同外殼接地。試壓前后,絕緣不應(yīng)有明顯變化,否則查找原因,及時(shí)處理。 斷路器試驗(yàn) 測(cè)量絕緣拉桿絕緣電阻,使用2500兆歐表,其值不低于1200 m。 測(cè)量每相導(dǎo)電回路的電阻值,應(yīng)符合產(chǎn)品技術(shù)文件規(guī)定。 在分、合閘狀態(tài)下的交流耐壓:合閘狀態(tài)試驗(yàn)電壓27kv,分閘狀態(tài)的試驗(yàn)電壓按產(chǎn)品技術(shù)文件規(guī)定。在試驗(yàn)中不應(yīng)發(fā)生貫穿性放電。 測(cè)量斷路器分合閘時(shí)間,應(yīng)在斷路器額定操作電壓下進(jìn)行,實(shí)測(cè)數(shù)值符合產(chǎn)品技術(shù)文件規(guī)定。斷路器合閘過(guò)程中,觸頭接觸后的彈跳時(shí)間不應(yīng)大于2ms。 測(cè)量分、合閘線圈及合閘接觸器線圈絕緣電阻,其值不應(yīng)低于10 m。直流電阻值與產(chǎn)
42、品出廠值相比應(yīng)明顯差別。 操作機(jī)構(gòu)試驗(yàn)調(diào)整:操作電壓在85%110%額定電壓范圍內(nèi)時(shí),機(jī)構(gòu)應(yīng)可靠動(dòng)作。直流分閘電磁鐵,在其端鈕處測(cè)得的電壓不大于65%額定電壓時(shí),應(yīng)可靠分閘,當(dāng)此電壓小于30%額定電壓時(shí),不應(yīng)分閘。 母線試驗(yàn) 母線絕緣測(cè)量,相間與對(duì)地分別進(jìn)行。 交流耐壓試驗(yàn),相間與對(duì)地分別進(jìn)行,試驗(yàn)電壓42kv。 低壓配電柜試驗(yàn)和調(diào)試 按規(guī)范要求對(duì)熱繼電器及電流互感器進(jìn)行試驗(yàn)、調(diào)試。 用ssg-9001型三表校驗(yàn)儀對(duì)現(xiàn)場(chǎng)新安裝的高低盤(pán)柜、操作柱等所有電流、電壓等表計(jì)進(jìn)行校驗(yàn)。誤差應(yīng)在規(guī)定范圍內(nèi),否則應(yīng)進(jìn)行調(diào)整或更換。試驗(yàn)中采用標(biāo)準(zhǔn)表計(jì)均應(yīng)按時(shí)送檢,并在檢定周期內(nèi)使用。 電氣控制回路調(diào)試 電氣安
43、裝工程一、二次回路接線完成后,可進(jìn)行控制回路調(diào)試及儀電聯(lián)校。采用外加臨時(shí)電源作為二次回路控制電源。把有聯(lián)系的其它專業(yè)的接線甩開(kāi),必要時(shí)用臨時(shí)線在端子排上短接。斷開(kāi)一次回路檢查控制接線正確,絕緣電阻合格后,接通控制電源。在現(xiàn)場(chǎng)按鈕箱上按下“起動(dòng)”、“停止”按鈕,在配電間內(nèi)觀察此回路交流接觸器及其它電氣元件,指示燈的動(dòng)作情況。發(fā)現(xiàn)問(wèn)題要對(duì)照?qǐng)D紙,查出原因并改正。 電氣專業(yè)控制、信號(hào)回路調(diào)試正確后,可進(jìn)行儀電聯(lián)鎖調(diào)試。儀電聯(lián)鎖調(diào)試與儀表專業(yè)共同進(jìn)行。 電氣安裝、調(diào)試工作全部結(jié)束后即可準(zhǔn)備投電試車。投電前要認(rèn)真編寫(xiě)投電試車方案,確定方法、步驟和程序,并重新對(duì)設(shè)備、線路、接地等進(jìn)行檢查,并將需投電的盤(pán)柜
44、全部模擬動(dòng)作可靠后方可按程序投電試車。 大型電動(dòng)機(jī)的投電試車要與鉗工、工藝人員密切配合,制定合理方案,并在運(yùn)行時(shí)做好詳細(xì)記錄。 第三章 儀表施工一. 施工準(zhǔn)備與施工程序 施工前認(rèn)真熟悉圖紙,做好圖紙會(huì)審工作,并以設(shè)計(jì)圖紙為指導(dǎo),標(biāo)準(zhǔn)規(guī)范為依據(jù),對(duì)到貨的設(shè)備和材料進(jìn)行認(rèn)真檢查。施工中注意與土建、工藝及機(jī)械等專業(yè)的交叉作業(yè),施工程序框圖如下:二施工方法及質(zhì)量要求1. 儀表的校驗(yàn)與調(diào)整 校驗(yàn)與調(diào)整要求 抽調(diào)有資格證的人員進(jìn)行儀表的校驗(yàn)與調(diào)整工作,校驗(yàn)用的標(biāo)準(zhǔn)儀器,要具備有效的鑒定合格證。 儀表校驗(yàn)前要首先對(duì)以下內(nèi)容進(jìn)行檢查 設(shè)備的型號(hào)、規(guī)格、材質(zhì)、測(cè)量范圍等要符合設(shè)計(jì)要求。外觀無(wú)變形、損傷、油漆脫落
45、,零件丟失等缺陷,外形主要尺寸要符合設(shè)計(jì)要求。 端子、固定件等必須完整,附件齊全,合格證及鑒定證書(shū)齊備。 儀表校驗(yàn)調(diào)整后要達(dá)到下列要求 基本誤差必須符合該儀表精度等級(jí)的允許誤差。 變差、同步誤差必須符合該計(jì)分表精度等級(jí)的允許誤差。 儀表零位正確,偏差值不超過(guò)允許誤差的1/2。 指針在整個(gè)行程中要無(wú)振動(dòng)、磨擦和跳動(dòng)現(xiàn)象。 電位器和可調(diào)節(jié)螺絲等可調(diào)部件在調(diào)校后要留有可調(diào)整余地。 數(shù)字顯示儀表數(shù)字顯示無(wú)閃爍現(xiàn)象。 分析儀表的反應(yīng)時(shí)間、比值精度符合說(shuō)明要求。 校驗(yàn) 溫度儀表校驗(yàn):雙金屬溫度計(jì)安裝前在量程范圍內(nèi)作示值校驗(yàn),校驗(yàn)不少于2點(diǎn)。熱電偶作導(dǎo)通和絕緣檢查,進(jìn)行熱電性能試驗(yàn)。 壓力、差壓儀表的校驗(yàn):
46、測(cè)量范圍小于0.1mpa的壓力表的校驗(yàn),用儀表空氣作信號(hào)源,用相應(yīng)測(cè)量范圍的標(biāo)準(zhǔn)壓力計(jì)進(jìn)行校驗(yàn);測(cè)量范圍大于0.1mpa的壓力表用活塞式壓力校驗(yàn)臺(tái)或手操泵加壓,用標(biāo)準(zhǔn)砝碼或數(shù)字式壓力計(jì)進(jìn)行校準(zhǔn)。膜盒式壓力計(jì),其精度校驗(yàn)用真空泵產(chǎn)生真空度與測(cè)量范圍相適應(yīng)的標(biāo)準(zhǔn)真空表進(jìn)行比較,精度符合設(shè)計(jì)要求。 智能變送器的校驗(yàn),采用便攜式編程器對(duì)智能變送器進(jìn)行組態(tài)檢驗(yàn),具體檢驗(yàn)方法和步驟如下:完成變送器校驗(yàn)配線后投電,編程器自檢,檢查編程器與變送器的通訊情況。選擇“save”將變送器的信息存入編程器的寄存器,防丟失,備用。檢查變送器工程單位,測(cè)量上限和下限、輸出方式(線性、開(kāi)方、小信號(hào)切除)、阻尼時(shí)間、位號(hào)等組
47、態(tài)參數(shù)。選擇回路測(cè)試,零點(diǎn)輸出設(shè)置為4ma,滿量程設(shè)置輸出為20ma。做好組態(tài)參數(shù)記錄 流量?jī)x表的檢驗(yàn):孔板、文丘利管等節(jié)流裝置進(jìn)行規(guī)格尺寸檢查并記錄。 調(diào)節(jié)閥的調(diào)校:調(diào)節(jié)閥是整個(gè)裝置的執(zhí)行部分,其性能直接關(guān)系到產(chǎn)品的質(zhì)量,系統(tǒng)和設(shè)備的安全。其檢查和調(diào)校步驟如下:外觀檢查:零部件齊全、裝配關(guān)系正確、緊固件無(wú)松動(dòng),整體潔凈。執(zhí)行機(jī)構(gòu)氣室的密封性試驗(yàn):將額定壓力的氣源輸入薄膜氣室中,切斷氣源,在5分鐘內(nèi)薄膜氣室中的壓力不得下降?;菊`差校驗(yàn):將規(guī)定的輸入信號(hào)平穩(wěn)地按增大和減少輸入薄膜氣室(或定位器),測(cè)定各點(diǎn)所對(duì)應(yīng)的行程值、計(jì)算基本誤差。變差校驗(yàn):校驗(yàn)方法同上,在同一輸入信號(hào)所測(cè)得的正反行程的最大
48、差值即為變差。始終點(diǎn)偏差校驗(yàn):將輸入信號(hào)的上、下限值分別加入薄膜氣室外(定位器);測(cè)量相應(yīng)的行程值,計(jì)算終點(diǎn)偏差。死區(qū)校驗(yàn):在輸入信號(hào)量程的25%、50%、75%三點(diǎn)上進(jìn)行校驗(yàn),其方法為緩慢改變輸入信號(hào),直到觀察出一個(gè)可察覺(jué)的行程變化,此點(diǎn)正掃兩方向的輸入信號(hào)差值即為死區(qū)。調(diào)節(jié)閥泄漏量試驗(yàn):試驗(yàn)介質(zhì)用清潔水或清潔空氣。試驗(yàn)壓力為0.35mpa,當(dāng)閥的允許壓差小于0.35mpa時(shí)用規(guī)定的允許壓差。事故切斷閥及有特殊要求的調(diào)節(jié)閥體必須進(jìn)行氣體泄漏量試驗(yàn),試驗(yàn)介質(zhì)用清潔空氣,試驗(yàn)壓力為0.35mpa或規(guī)定的壓差,采用排氣法,收集1分鐘內(nèi)調(diào)節(jié)閥的泄漏量,允許泄漏量必須符合表中規(guī)定。調(diào)節(jié)閥允許泄漏量:規(guī)
49、格允許泄漏量ml/min每分鐘氣泡數(shù)dn250.151dn400.32dn500.453dn650.604dn800.906dn1001.7011dn1504.0027dn2006.7545dn25011.10dn30016.00dn35021.60dn40028.40調(diào)節(jié)閥還需進(jìn)行全程試驗(yàn),行程偏差符合設(shè)計(jì)規(guī)定;對(duì)帶閥門(mén)定位器的調(diào)節(jié)閥,行程允許偏差為1%;事故切斷閥還需進(jìn)行全行程時(shí)間試驗(yàn),該時(shí)間小于10秒。 分析儀表和檢測(cè)器調(diào)校 氧化鋯分析儀、可燃?xì)怏w檢測(cè)器等分析儀表:分析儀表一般不進(jìn)行單表校驗(yàn),在安裝完畢后,按照說(shuō)明書(shū)的要求,利用廠家提供的標(biāo)準(zhǔn)方案和標(biāo)準(zhǔn)樣氣(液),進(jìn)行性能檢查和精度校驗(yàn)。
50、氣體分析儀表調(diào)試采用樣氣標(biāo)定。零點(diǎn)調(diào)整:導(dǎo)入零點(diǎn)樣氣,調(diào)節(jié)流量為500ml/min進(jìn)行充分置換,調(diào)整零點(diǎn)電位器,使液晶顯示為0.00%,信號(hào)輸出為40.2ma。量程調(diào)整:導(dǎo)入量程樣氣,調(diào)節(jié)流量為500ml/min進(jìn)行充分置換,調(diào)整量程電位器,使液晶顯示為100%,信號(hào)輸出為200.2ma??扇?xì)怏w檢測(cè)器檢測(cè)根據(jù)設(shè)計(jì)提供的設(shè)定值,利用標(biāo)準(zhǔn)的樣氣,按使用說(shuō)明書(shū)提供的方法,在安裝完畢后進(jìn)行性能檢查。校驗(yàn)合格后的儀表在表體上貼帶有儀表位號(hào)的合格標(biāo)簽,整齊存放并保持清潔。2. 常規(guī)儀表設(shè)備安裝 儀表安裝的要求 現(xiàn)場(chǎng)就地儀表安裝在便于觀察維護(hù)的位置。安裝在工藝管道上的儀表在管道吹掃時(shí)必須將其拆下,待吹掃完
51、成后再重新安裝。儀表外殼上的箭頭指向必須與管道介質(zhì)流向一致。 儀表的安裝 溫度儀表安裝:溫度檢測(cè)儀表的保護(hù)套管在安裝前要進(jìn)行液壓強(qiáng)度試驗(yàn),試驗(yàn)壓力為工作壓力的1.5倍,穩(wěn)壓10分鐘無(wú)泄漏為合格。安裝在工藝管道上的溫度計(jì),應(yīng)插入管道中心,插入方向與被測(cè)介質(zhì)逆向,管道直徑小于80mm時(shí)必須加擴(kuò)大管。在煙道氣溫度測(cè)量處的熱電偶,由于測(cè)溫點(diǎn)的溫度高、插入深度深且是水平安裝,因此必須采取防彎措施。 壓力儀表安裝:在工藝管道基本結(jié)束時(shí)進(jìn)行壓力表安裝,表的朝向面向操作員便于觀察的方向。 分析儀表及氣體檢測(cè)儀表的安裝分析儀表取樣系統(tǒng)安裝:核查樣品的除塵、除濕、減壓以及對(duì)有害和干擾成分的處理系統(tǒng)是否完善。分析儀
52、及取樣系統(tǒng)安裝位置盡量靠近取樣點(diǎn),并符合使用說(shuō)明書(shū)的要求。 就地儀表盤(pán)、保溫箱的安裝儀表盤(pán)、保溫箱嚴(yán)禁用氣焊焊接開(kāi)孔。支架底座尺寸要與設(shè)備尺寸一致,安裝要垂直平整、牢固。 就地儀表盤(pán)、保溫箱的安裝儀表盤(pán)、保溫箱水平方向的傾斜度允許偏差為3mm。垂直度允許偏差為3mm,設(shè)備高度大于1.2m時(shí),垂直度允許偏差為4mm。3. 電纜槽盒安裝 電纜槽盒安裝前按照設(shè)計(jì)圖紙制作好托架,對(duì)托架進(jìn)行除銹、刷漆處理。槽盒之間用螺栓和連接板連接,為了防止損傷電纜,螺母要在槽盒的外側(cè)。在槽盒上開(kāi)保護(hù)管孔采用液壓開(kāi)孔器或其他機(jī)械開(kāi)孔器開(kāi)孔,開(kāi)孔的位置要處于匯線槽高度2/3以上處;槽盒切割采用電動(dòng)曲形鋸。為保持槽盒的直線
53、度,在托架上焊上限位板。水平長(zhǎng)度超過(guò)20米時(shí),匯線槽線板不應(yīng)直接固定在支架上,應(yīng)在支架上焊接導(dǎo)向板,使匯線槽在導(dǎo)向板內(nèi)能滑動(dòng)自如,槽板接口處留適當(dāng)?shù)呐蛎涢g隙。4. 電纜保護(hù)管敷設(shè) 安裝前要檢查保護(hù)管是否有裂紋,鍍鋅層是否完好。保護(hù)管的彎制采用冷煨法,60以上的保護(hù)管采用標(biāo)準(zhǔn)的預(yù)制彎頭。彎曲后角度不小于90,單根保護(hù)管的直角彎不超過(guò)兩個(gè)。保護(hù)管的直線長(zhǎng)度超過(guò)30m或彎曲角度總和超過(guò)270時(shí),中間必須加穿線盒。保護(hù)管與連接件之間,采用螺紋連接,管端螺紋的有效長(zhǎng)度要大于管接頭的1/2。并保持管路的電氣連續(xù)性,絲扣連接部分涂導(dǎo)電性防銹脂。當(dāng)保護(hù)管直線長(zhǎng)度超過(guò)30m且沿塔槽或穿過(guò)建筑物伸縮縫時(shí)采取熱膨脹
54、補(bǔ)償措施。保護(hù)管與儀表之間采用撓性連接管。低于進(jìn)線口約250mm,保護(hù)管從上向下敷設(shè)時(shí)在管末端加排水三通,儀表進(jìn)線口用密封墊或密封膠泥密封。保護(hù)管要排列整齊,橫平豎直,支架之間的距離不大于2m,在拐彎管端300mm處必須安裝支架并用u型螺栓或管卡固定。保護(hù)管穿過(guò)樓板或鋼平臺(tái)時(shí),不得切斷樓板內(nèi)鋼筋或平臺(tái)鋼梁,開(kāi)孔準(zhǔn)確,大小適宜。穿過(guò)樓板時(shí)加保護(hù)套管;穿過(guò)鋼平臺(tái)時(shí),焊接保護(hù)套或防水圈。在工藝管道、設(shè)備上用抱卡固定保護(hù)管,在不銹鋼管道上做抱卡必須加墊層。5. 現(xiàn)場(chǎng)接線箱安裝 安裝位置不影響操作、通行和維修,并標(biāo)明編號(hào)。在鋼結(jié)構(gòu)上安裝的接線盒,其支架應(yīng)考慮防火涂層厚度,確保標(biāo)高符合設(shè)計(jì)要求。為了防止雨水進(jìn)入接線箱,進(jìn)出接線盒的電纜要從接線箱底部進(jìn)線,且注意密封。6. 控制電纜電纜敷設(shè) 電纜敷設(shè)按規(guī)格型號(hào)、走向繪出電纜敷設(shè)排列圖,敷設(shè)時(shí)注意整齊、美觀。電纜敷設(shè)前進(jìn)行以下檢查。 槽盒安裝完畢,清掃干凈,內(nèi)部平整,無(wú)毛刺,隔板安裝間距正確。 電纜型號(hào)、規(guī)格符合設(shè)計(jì)要求,外觀良好,保護(hù)層無(wú)破損。 電纜絕緣電阻和導(dǎo)通檢查合格,電纜(電線 )用500v直流兆歐表測(cè)量絕緣電阻大于5m,用100v兆歐表測(cè)量補(bǔ)償導(dǎo)線絕緣電阻大于5 m。 電纜敷設(shè)原則上先遠(yuǎn)后近,先集中后分散。敷設(shè)前先實(shí)測(cè)長(zhǎng)度,兩端預(yù)留1.01.5m,根據(jù)實(shí)測(cè)值對(duì)每盤(pán)電纜的敷設(shè)根數(shù)進(jìn)行分配。補(bǔ)償導(dǎo)線或
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- MySQL高可用性方案解析試題及答案
- 高中生物選修三模塊檢測(cè)卷:2025年秋季學(xué)期期末復(fù)習(xí)重點(diǎn)試題解析
- 內(nèi)孔磨削技術(shù)培訓(xùn)
- 護(hù)理布置睡眠環(huán)境
- 初中物理第二章 運(yùn)動(dòng)與能量綜合與測(cè)試習(xí)題
- 2025年注冊(cè)計(jì)量師(一級(jí))計(jì)量專業(yè)模擬試題:測(cè)量誤差案例分析及誤差分析案例分析
- 2025年小學(xué)語(yǔ)文畢業(yè)升學(xué)考試全真模擬卷(語(yǔ)文綜合實(shí)踐活動(dòng)設(shè)計(jì))之閱讀理解能力提升方法
- 2025年消防執(zhí)業(yè)資格考試題庫(kù):消防設(shè)施檢測(cè)與維護(hù)專項(xiàng)試題庫(kù)
- 2025年消防安全知識(shí)培訓(xùn)考試題庫(kù):消防宣傳教育方法創(chuàng)新試題集解析技巧寶典
- 福建省莆田第二十五中學(xué)2020-2021學(xué)年高一上學(xué)期第一次月考試題(歷史)
- 美術(shù)鑒賞學(xué)習(xí)通超星期末考試答案章節(jié)答案2024年
- 2023年山東煙臺(tái)中考滿分作文《這一路風(fēng)光真好》
- 《更加注重價(jià)值創(chuàng)造能力 著力推進(jìn)國(guó)企高質(zhì)量發(fā)展》
- 小學(xué)綜合實(shí)踐活動(dòng)《來(lái)之不易的糧食》課件
- 關(guān)于我校中學(xué)生錯(cuò)誤握筆姿勢(shì)調(diào)查及矯正的嘗試
- 積分制管理的實(shí)施方案及細(xì)則
- T-CRHA 049-2024 結(jié)核病區(qū)消毒隔離護(hù)理管理規(guī)范
- 正定古建筑-隆興寺
- 走進(jìn)物理-基礎(chǔ)物理智慧樹(shù)知到答案2024年廣西師范大學(xué)
- 畢業(yè)設(shè)計(jì)中期報(bào)告
- 呼和浩特市消防救援支隊(duì)招聘政府專職消防員筆試真題2022
評(píng)論
0/150
提交評(píng)論