




已閱讀5頁,還剩3頁未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
Feasible plan of greasy filth grit treating project in Kuwait treating technology of greasy filth grit:The technology of Qingdao Kangtaizhongli Environment Protectional Technological Co.Ltd. absords the principle of physical classifying and gravity up and down. It can realize the classifying, separating and cleaning function of big brain in the mud with oil. The ion treating equipment of mud with oil and its application experience. Our company has abundant experience and applying achievements in the pre-treating and treating in the end of the mud(mainly is the pressing, drying and biological modifying). The treating equipment can be used in all kinds of dangerous oil pollution coming from the oil industry producing such as well drilling, absorbing and manufacturing etc. Our treating principle and main process is as the following for the waste with oil: l 1st step:classifying and choosing(heating, adding medicine and stiring);l 2nd step:eliminating the bigger impurity with the 8g vibration;l 3th step:eliminating 90% micro solids with 3000g two-phase centrifugal machine;l 4th step:absorbing the 6000g three phase centrifugal machine. The separated oil can reach the second use standard; the separated water can be further treated; the separated solids can be fixed with the previous ones and prepared to be further treated;l 5th step:absorbing the 12000-g three-phase centrifugal machine. The separated water can satisfied the demand of WWTP or the treating demand of polluted sea water.l 6th step:having the microorganism modified treatment, make the oil content separated from the solids satisfy the demand of the oil content in the local land.。Inputitng materialschoosingthree-phase centrifugalAnalizing machineoilwaterSolid remainHeat converterBiological treatmentmodulationClassifying and choosing According to the treating project of mud contenting with oil in Kuwait, our company offers the following preliminary treating plan:Pre-treating modelBiological modifyingMKIII equipmentCutting and cleaning the bagsliquidsolidaccumulation回收或市政處理Oil retrievingWater into WWTP or used inpre-treatingsolidOrgnic solidStandardizing treatmentModulation and heating The pre-treating model includes digging pump, feed container, up and down tank cleaned itself, heat converter, conveyer and delivering liquid pump. The core MKIII equipment is mainly two-phase and three-phase centrifugal machine, assisted by modulation and heating equipment. The general distribution is such as the following:柴油罐:diesel oil tank現(xiàn)場(chǎng)記錄辦公室和實(shí)驗(yàn)室:on-the-spot recording office and laboratory 加熱爐撬: heating furnace pry工廠和工具儲(chǔ)備間: factory and tools storage room進(jìn)料罐: intake materials tank凈化油罐:filtering oil tank含油水罐: water tank with oil凈化水罐:filtering water tank水處理:water treatment裝置撬:equipment pry廢料:wasteIon separation is the key technology in our company. We provide the treating system of mud contenting with oil for oilfield, refinery, shipping and other industry area. We have effective treating and retrieving to the mud contenting with oil which has complicated materials. Our treating equipment has good automation and strong integrating ability. investment estimating form of equipment project construction indetails orderIndividual project nameunitamountUnit indexBudgetary estimating(ten thousands yuan)totalEquipment costTotal Equipment cost一Project cost2341.1(一)Principal construction261.71Pre-treating equipment tank 1162.5mm31650.09014.92Electricity roomm247.250.157.13On duty controlling romm2270.154.14Repairing roomm2270.154.15Laboratorym2270.154.16Storagem220.250.24.17Locker roomm213.50.162.28Tools roomm211.250.141.69Washing room(square:9 m2)/11.441.410Heating furnacem2540.189.711Principal equipment colorful steel riot mill 27218mm25670.24136.112Covering rain tent(heating furnace)m2450.115.013Covering rain tent(pre-treating equipment)m2660.117.314Covering rain tent(mud storage)m25460.1160.0(二)Equipment cost2079.4110t/h set equipment of separationSet1236.7188.0236.72Heating furnace 1200kWSet1103.590.0 103.53Transformer and electrical system HBP-WNDK-400/30set180.662.0 80.6430t/h mud classifying and choosing pre-treating equipmentset1632.5550.0 632.55Modulation tank HBP-TZG135set369.060.0207.06API separator oil from water HBP-FLQ50set152.946.052.97Regulating water tank HBP-YSG50set132.228.0 32.28Set equipment of retrieving and increasing the pressure HBP-FZ-22set413.2511.053.09excavator/135.0 35.0 35.0 10Loading machine/122.0 22.0 22.0 11Skip car/110.0 10.0 10.0 (三)Automatic controlling system HBP-WNZK-100/1125.3125.3(四)Factory area/1196.6(五)System out of the station33.41Polluted oil retrieving system1)Polluted oil tube DN50km0.213.239.132.6 2)Heating tube DN20km0.46.794.412.7 2Gas tube DN100km0.0417.75 13.14 0.7 3Electrical line 6kVkm0.110.761.1 4Water tube DN100km0.0324.6314.310.7 5Road system1)Road into the stationkm0.1555.5 2)Earth workkm33.63.2411.7 6Communication coursekm1.84.268.3 (六)Implements purchasing cost1.9二Other cost98.8三Preparing cost124.7四Total investment2079.4Covering the land permanentlym25093 annualy operating cost institution form ordernameUnitamountpriceCost一Annually operating costTen thousands780.11Gas104m352.000.8242.62medicine104t25.002.050.003Water104t0.33.951.14electricity104kv.h129.60.5570.95Pay and wareTen thousands160.46Repairing chargeTen thousands64.07depreciationTen thousands391.5二Unit operating costYuan/ton390.05remarks:.furl charge:heating furnace 1200kW,it will cost 2880 m3 gas everyday;.repairing charge:the equipment must
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 成長教練服務(wù)協(xié)議書
- 成功協(xié)議離婚協(xié)議書
- 康復(fù)護(hù)理公司協(xié)議書
- 放棄收養(yǎng)孤兒協(xié)議書
- 房屋地基出租協(xié)議書
- 成品收購合作協(xié)議書
- 心臟支架手術(shù)協(xié)議書
- 房屋預(yù)訂協(xié)議協(xié)議書
- 店面合作分開協(xié)議書
- 店鋪會(huì)員合作協(xié)議書
- 高溫后超高性能混凝土力學(xué)性能研究
- 高中主題班會(huì) 常規(guī)管理促狀態(tài)規(guī)范月課件-高二上學(xué)期主題班會(huì)
- 金屬冶煉負(fù)責(zé)人安管人員培訓(xùn)
- 關(guān)于比的知識(shí)圖文
- 拓?fù)浣Y(jié)構(gòu)特征提取-深度研究
- 建筑美學(xué)知到智慧樹章節(jié)測(cè)試課后答案2024年秋華南理工大學(xué)
- 統(tǒng)編版語文七年級(jí)下第18課《井岡翠竹》公開課一等獎(jiǎng)創(chuàng)新教學(xué)設(shè)計(jì)
- 針刺傷預(yù)防與處理-2024中華護(hù)理學(xué)會(huì)團(tuán)體標(biāo)準(zhǔn)
- 《高等教育心理學(xué)》講義
- 2025年汽車轉(zhuǎn)向橋總成行業(yè)深度研究分析報(bào)告
- 基裝合同范例版
評(píng)論
0/150
提交評(píng)論