接管與法蘭Nozzle and the flange將坡口加工好的接口與相對應(yīng)法蘭進行組裝,要求:間隙34mm,錯邊在1.5mm以下,氬弧焊打底,全熔透結(jié)構(gòu)。焊接完成后送無損檢測,檢驗標準RT( )%,級合格。Assemble the groove machined nozzle with the corresponding flange, requirements: the gap is 3 4mm, the staggered side is less than 1.5mm, argon arc bottoming, full penetration structure. After welding,having a non-destructive testing, the inspection standards is RT () class, III qualified.支座點焊Supportswelding1.按圖對支座的底板、筋板、立板進行組裝前的檢查。In accordance with drawings, inspect the supports backplane, ribs, riser before assembling.2.組裝各部件,點固,加支撐件等,焊接。Assemble every component, solid point, support pieces, and welding.接管支座與殼體組裝Nozzle supports and shell assembling1.按先前標出的0、90、180、270方位點,延長在殼體上。Base on the previously marked 0 , 90 , 180 , 270 compass points, extending to the hcase.2.畫出接管、支座,預(yù)開孔,安裝位置,即坐標點。Draw the nozzle, supports, pre-openings, the installation location, that is, the coordinates of points3.檢驗合格后,開孔,然后打上坡口,角度為外坡口30After Inspection, opening, then grooving,the angle of the outer groove is30 4.組對接管與殼體,組裝前,接管必須將補強圈帶上固定好,一起裝配。Connect nozzle to shell, before assembling,the nozzle must fix the reinforcement ring,along with the equipment.5.接管與殼體組對間隙為23mm,且間隙均勻。The gap of the nozzle and shell is 2 3mm, and the gap is uniform6.焊接完畢后,內(nèi)接管須清根封底,焊縫打磨與母材齊,并倒245圓角。After welding, to nozzle requires to clear the root of the back cover, weld and polise to ensure the base metal level, and the fillet is 2 45 .管箱Tube box1.封頭:材質(zhì)確認,標記移植,切割,外協(xié)模壓,回廠檢驗,材質(zhì)為( ),( )。Head: Material confirmation , mark and transplante, cutting, outsourcing molding, back to the factory inspection, the material is (), ().2.短節(jié):材質(zhì)確認 a.按排版圖尺寸劃線下料坡口加工。(見具體工藝文件) Short section: material confirmation a. Drawing, crossed material and groove processing by the size of the layout chart. (See the specific process documents). b.卷板,縱縫焊接,校圓,縱縫RT( )%,級合格,車加工削薄。 b. coil, longitudinal seam welding , regulate round, longitudinal seam RT (), III class qualified ,vehicle processing thinning.3.管箱法蘭與短節(jié)組裝:a.管箱法蘭與短節(jié)組焊,封頭與短節(jié)組焊。Flange and short section of the tube box assembly: a. tube box flange and a short section welding,the head and a short section welding。b.對環(huán)縫進行射線檢測。Ring sewn-ray detection.c.與殼體聯(lián)接,整體劃線,開孔,接管組裝,焊接,確保其整體一致性。Connection with the shell, the overall drawing,openings, nozzle assembly, welding, ensure that its overall consistency.d.卸下管箱,對接管法蘭清根封底,劃出隔板安裝線,再按封頭實樣放樣切割,裝配隔板和焊接,裝配要求:每層隔板端口尺寸必須與固定端管板( )槽一致吻合。(d) Remove the tube box, clear the root of the nozzle of the flange, draw the bulkhead install line, and then cutting base on the real shape of the head, assembling the bulkhead and welding, assembly requirements:each partition port size must be consistent with the fixed end of the tube plate () notch.e.做好熱處理前支撐,防止熱處理使隔板變形。Do good support before heat treatment to prevent heat treatment so that bulkhead deformationf.熱處理完畢冷卻后,再加工密封面,保證法蘭密封面與隔板端平面一致。After the heat treatment and cooling, reprocessing the sealing surface to ensure the flange sealing surface and the baffle-side plane consistent.外頭蓋the outsidebonnet1.封頭:材質(zhì)確認 劃線,標記移植,切割,外協(xié)模壓,回廠檢驗,貼合格標簽。Head: The material confirmation, mark and transplante, cutting, outsourcing molded, back to the factory inspection, paste qualified label.2.短節(jié):材質(zhì)確認 按圖尺寸劃線,切割,坡口精加工,卷板,焊接,校園。Short sections: materials confirmation drawing base on the size of the chart, cutting and finishing of the groove, plate bending, welding, regulate round.3.法蘭與封頭,短節(jié)組焊:a.將合格封頭和短節(jié)及對應(yīng)法蘭組焊,錯邊量控制在02mm之間。Flange and the head, a short section of welding: (a) welding the qualified head ,a short section and the corresponding flange, the stagger volume is controlled between 0 2mm.b.環(huán)縫焊接,無損檢測。(b).The girth welding, nondestructive testing.c.劃線開孔,安裝管嘴和吊耳,焊接 (c). Drawing and opening, install the nozzle and lug ,welding.d.與殼體、管箱、浮頭蓋,一并整體熱處理。(d).The shell, tube box, floating cover, together with the overall heat treatment.浮頭蓋Floating bonnet1.拱蓋:材質(zhì)確認 劃線下料,標記移植、切割,外協(xié)模壓、回廠檢驗。Ledge: material confirmation Drawing and cutting, mark transplantation, cutting, outsourcing molding, back to the factory inspection.2.浮頭法蘭:在材料檢驗員指定下領(lǐng)取貼有合格標簽的法蘭。 Floating head flange: receive designated qualified label of the flange under the guidiance of the materials inspector .3.將拱蓋與浮頭法蘭組裝,裝配尺寸如圖。Assemble ledge and floating head flange, the assembly size shown in Figure。4.焊接完畢后,再按拱蓋的實形放樣、隔板、切割、組裝、焊接,確保隔板裝配尺寸與浮動管板槽尺寸一致。After welding, the then loft base on the real shape, bulkhead,cutting, assembling, welding, ensure size of the bulkhead, assembly size and floating tube notch groove consistent.5.與前殼體、外頭蓋及管箱一并進爐熱處理。Having a heat treatment furnace to the front shell, the outside bonnet and the tube box .管束tube bundle換熱管1材質(zhì)確認:( )( ) 規(guī)格( )。Material confirmation: ( )( ) Specification().2單管試壓,試驗壓力為設(shè)計壓力的2倍,即( )MPa。Single-tube testing pressure,the pressure is 2 times the design pressure,that is () MPa.管板本鍛件應(yīng)按JB4726制造與驗收,進行PT檢測,依圖數(shù)控放樣、鉆孔、隔板槽銑加工、倒坡口、拉絲孔攻絲。The forgings shall be JB4726 manufacture and acceptance ,PT detection, according to Figure NC loft, drilling, the bulkhead.slot milling, chamfer the groove, wire drawing hole tapping.折流板1.材質(zhì)確認,Q235B,16,數(shù)控放樣切割,去渣,整形,打垛點固焊。Material confirmation,Q235, 16, CNC cutting loft, remove the residue, shaping, playing stack point of solid welding.2.數(shù)控劃線,鉆孔,折流板車園,做標記順序號,單塊剪切去毛刺。NC drawing, drilling, baffle to car round, mark the order number, a single block of shear deburring.3.順序號移植,管孔倒角,折流板打磨,整形。Sequence number transplantation, pore chamfer, baffle polished, plastic管束其它輔件加工定距管機加工,拉桿端點過絲,滑道旁路擋板剪切下料、整形。Distance tube machining, rod endpoint wire, slide the bypass damper shear cutting, shaping.管束組裝1.立架:先將固定管板直于工裝平臺架上,依次按圖安裝拉桿、距管、折流板,鎖緊拉桿螺姆。Stands: first fixed tube plate straight to the tooling platform rack, followed by the plan to install the rod ,the distance tube, baffle, locking lever screw farm2.處理管板孔和管板面上的油污、銹蝕等。Dealing with the tube sheet holes and the tube sheet surface oil, corrosion, etc.3.穿管:穿管完畢后再上浮動管板,定尺定位,點焊,再回管。Tube cross: crossing the tube ,then installing the floating tube sheet, length positioning, spot welding and then back to the tube.4.管頭焊、切管、打磨、浮動端管頭焊,支耳調(diào)試,安裝焊接,管頭兩端熱處理。Tube head welding, tube cutting, polishing, floating side tube head welding, lugs debugging, install the welding, the tube head at both ends of heat treatment5.脹管(見脹管工藝卡),脹管器按編號到倉庫領(lǐng)用,規(guī)格為( )( )( )。Expander (see the expanding technology card), the expander by number to the warehouse recipients, specifications are ( )( )( ).6.安裝滑道并焊接。Installation of slide and welding管束試壓管頭試壓,試驗壓力( )MPa(見試壓工藝)水壓試驗時下列情況為合格:無滲漏,無可見變形,過程中無異常響聲。Tube head pressure test, the test pressure is () MPa (see Pressure Test) .hydrostatic test, the following conditions are eligible: no leakage, no visible distortion, no abnormal noise in the process.整體試 壓overall pressure test1.將管束試壓合格后,裝入殼體中After passing the pressure test,put the bundle into the shell.2.安裝兩端管箱,浮頭蓋,裝配時注意墊片的保護,均勻?qū)准菟ňo固。安裝管箱,浮頭蓋時,一定做好隔板槽和隔板銜接口標記,穩(wěn)合統(tǒng)一。Install both ends of tube box, floating bonnet ,pay attention to the protection of the gasket assembly, bolt a few pieces evenly. When installing the pipe box, floating head cover, be sure to do the partition groove and clapboard convergence mouth mark, stable co-unified.3.螺栓擰緊時,要分步驟,先預(yù)緊等分四顆,即0、90、180、270,再逐步對稱緊固。用力要均勻,最后對螺栓進行全面緊固。When tightening the bolts, step by step, decile four first , namely, 0 , 90 , 180 , 270 , and then gradually tighten the symmetry. Forced evenly, at last full tightening the bolts.4.將管箱上( )孔,即下端接管用盲板封住,緊螺栓,( )注水,用行車配合作業(yè),上下來回起落,將管程中空氣排凈為止,狀態(tài)為不顯現(xiàn)汽泡靜止面,再封?。?)口,緊固螺栓。Tube box () hole, seal the bottom nozzle by the blind plate,bolt, () inject, operate with a driving car, up and down, until draining the process air of the tube , the state does not show bubble stationary surface, and then sealed () and tighten the bolts.5.按試壓工藝卡,分步驟循序淅升。According to the pressure test card, step-by-step sequential Hsi-l.6.檢驗易池漏區(qū)、面和焊道,無泄漏,無異常響動為合格。Tes
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 頂崗老師班會課件模板
- 金屬冶煉負責(zé)人安管人員培訓(xùn)
- 音樂課國防教育課件
- 水肌酸產(chǎn)品項目運營管理方案
- 電網(wǎng)側(cè)獨立儲能示范項目經(jīng)濟效益和社會效益分析報告
- 城鎮(zhèn)污水管網(wǎng)建設(shè)項目人力資源管理方案(模板范文)
- xx片區(qū)城鄉(xiāng)供水一體化項目建設(shè)管理方案
- 先進金屬材料行動計劃
- 無人駕駛配送車輛定位精度提升
- 2025年井下多功能測振儀項目建議書
- 《房顫的診斷及治療》課件
- 康養(yǎng)護理程序基本知識
- 2025高考英語全國II卷試題分析及備考策略指導(dǎo)課件
- 金融衍生品市場風(fēng)險監(jiān)測指標-深度研究
- 賣火柴的小女孩兒童閱讀繪本課件
- 中國新聞社招聘考試試卷及答案2022
- 腦血管病防治指南(2024年版)完整版
- 消化道穿孔護理
- TYCST 004-2024 透水水泥穩(wěn)定碎石基層 透水系數(shù)的測定
- 部門級安全培訓(xùn)試題加解析答案可打印
- 醫(yī)學(xué)教材 暴發(fā)性心肌炎
評論
0/150
提交評論