




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、 山東天齊置業(yè)集團(tuán)股份有限公司 STT113塔機(jī)安裝專項(xiàng)施工方案文件編號(hào):發(fā) 放 號(hào):太平洋在線服務(wù)中心3#塔機(jī)STT113塔吊安裝施工方案(魯CH-T )安裝單位:山東天齊置業(yè)集團(tuán)股份有限公司編 制: 郭 皆 濤 編制時(shí)間: 2015年9月14日 目 錄第一節(jié) 編制依據(jù)···························
2、183;··································2第二節(jié) 工程概況··············
3、;················································3一 工程主要情況
4、183;·················································
5、183;·······3二 方案選擇·········································&
6、#183;·····················3三 塔機(jī)設(shè)計(jì)參數(shù)··························
7、3;·······························4第三節(jié) 施工安排·················&
8、#183;···········································6一 塔機(jī)安裝目標(biāo)····
9、3;·················································
10、3;···6二 組織管理機(jī)構(gòu)·············································&
11、#183;············6第四節(jié) 施工準(zhǔn)備及資源配置計(jì)劃··································
12、83;········8一 施工準(zhǔn)備········································
13、183;······················8二 資源配置計(jì)劃··························
14、;································8第五節(jié) 施工工藝要求················
15、·······································10一 施工工藝流程·········
16、183;···············································10二 操作要點(diǎn)·
17、··················································
18、···········10 三 安裝質(zhì)量要求及自檢驗(yàn)收····································
19、183;·········21第六節(jié) 安全措施及注意事項(xiàng)······································
20、;·········23一 危險(xiǎn)源辨識(shí)·······································
21、183;···················23二 安全風(fēng)險(xiǎn)控制····························
22、3;····························23三 塔吊安裝安全措施···················
23、3;································25四 塔吊安裝注意事項(xiàng)···············
24、3;····································26第七節(jié) 試驗(yàn)及驗(yàn)收············
25、;··············································27一 限制器的調(diào)整··&
26、#183;·················································&
27、#183;····27二 載荷試運(yùn)行···········································
28、3;···············27三 驗(yàn)收·································
29、3;································28第八節(jié) 附圖················
30、183;·················································30
31、 附圖一 塔機(jī)平面布置圖················································
32、···30 附圖二 塔機(jī)基礎(chǔ)圖·············································
33、···········31 第一節(jié) 編制依據(jù)本塔機(jī)安裝施工方案依據(jù)國(guó)家有關(guān)塔機(jī)現(xiàn)行技術(shù)標(biāo)準(zhǔn)、規(guī)范和規(guī)程、塔機(jī)使用說(shuō)明書、施工圖紙、地質(zhì)勘察報(bào)告及施工組織設(shè)計(jì)等內(nèi)容編制而成,主要依據(jù)有:序號(hào)類 別標(biāo) 準(zhǔn) 名 稱編 號(hào)1國(guó)標(biāo)建筑工程現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范GB50194-20142國(guó)標(biāo)塔式起重機(jī)安全規(guī)程GB5144-20063國(guó)標(biāo)塔式起重機(jī)GB/T5031-20084國(guó)標(biāo)起重機(jī)械用鋼絲繩檢查和報(bào)廢實(shí)用規(guī)范GB/T5972-20065國(guó)標(biāo)塔式起重機(jī)設(shè)計(jì)規(guī)范GB/T13752-19926行標(biāo)建
34、筑現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范JGJ46-20057行標(biāo)建筑施工安全檢查標(biāo)準(zhǔn)JGJ59-20118行標(biāo)建筑施工高處作業(yè)安全技術(shù)規(guī)范JGJ80-19919行標(biāo)施工現(xiàn)場(chǎng)機(jī)械設(shè)備檢查技術(shù)規(guī)程JGJ160-200810行標(biāo)塔式起重機(jī)安裝、使用、拆卸安全技術(shù)規(guī)程JGJ196-201011行標(biāo)建筑施工起重吊裝安全技術(shù)規(guī)范JGJ276-201212行標(biāo)高空作業(yè)機(jī)械安全規(guī)則JGJ5099-199813行標(biāo)塔式起重機(jī)混凝土基礎(chǔ)工程技術(shù)規(guī)范JGJ/T187-200914行標(biāo)大型塔式起重機(jī)混凝土基礎(chǔ)工程技術(shù)規(guī)程JGJ/T301-201315行標(biāo)建筑起重機(jī)械安全評(píng)估技術(shù)規(guī)程 JGJ/T189-200916地標(biāo)建筑施工現(xiàn)場(chǎng)
35、塔式起重機(jī)安裝拆卸安全技術(shù)規(guī)程DBJ14-065-201017特種設(shè)備安全監(jiān)察條例國(guó)務(wù)院令第549號(hào)18建筑起重機(jī)械安全監(jiān)督管理規(guī)定建設(shè)部令166號(hào)19STT113塔式起重機(jī)說(shuō)明書20天齊·太平洋在線服務(wù)中心地質(zhì)勘查報(bào)告21天齊·太平洋在線服務(wù)中心施工圖紙22天齊·太平洋在線服務(wù)中心施工組織設(shè)計(jì)第二節(jié) 工程概況一、工程主要情況 太平洋在線服務(wù)中心工程位于淄博新區(qū),原山大道以東,華光路以北,天津路以西,總建筑面積75872.7,包括1#、2#、3#、4#樓及地下車庫(kù),建筑高度27.9m,建筑結(jié)構(gòu)形式為框架結(jié)構(gòu),二類高層公共建筑,耐火等級(jí)二級(jí),抗震設(shè)防類別丙類,抗震設(shè)
36、防烈度7度,外墻未干掛鋁板幕墻、玻璃幕墻及涂料幕墻。 工程?hào)|西長(zhǎng)約157.6m,南北寬約244.6m,呈不規(guī)則多邊形,建筑使用功能以綜合辦公為主,兼有商業(yè)、服務(wù)、培訓(xùn)等功能,耐火等級(jí)二級(jí)。本工程一層為員工餐廳、廚房、商鋪及員工培訓(xùn),二至六層為辦公、會(huì)議及附屬用房,屋面設(shè)交通核。 地下車庫(kù)位于基地地下,框架結(jié)構(gòu),設(shè)三個(gè)車行出入口,分別位于2#樓、3#樓和4#。地下車庫(kù)層數(shù)一層,主樓范圍內(nèi)層高4.4m,其余部分層高3.7m、3.6m;地下車庫(kù)分七個(gè)防火區(qū),設(shè)有2個(gè)直通室外的封閉樓梯間。地下車庫(kù)內(nèi)通車道為了保持通行順暢,采用雙行原則。地下車庫(kù)耐火等級(jí)為一級(jí)。本塔機(jī)安裝責(zé)任主體單位情況:建設(shè)單位:淄博
37、市保障房投資建設(shè)有限公司設(shè)計(jì)單位:山東三力建筑設(shè)計(jì)有限公司監(jiān)理單位:山東同力建設(shè)項(xiàng)目管理有限公司勘察單位:淄博市勘察測(cè)繪研究院有限公司設(shè)備產(chǎn)權(quán)單位:山東天齊置業(yè)集團(tuán)股份有限公司安 裝 單 位 :山東天齊置業(yè)集團(tuán)股份有限公司二、方案選擇1、塔吊的選擇太平洋在線服務(wù)中心3#塔機(jī),根據(jù)項(xiàng)目部施工計(jì)劃,構(gòu)件吊裝末端53m處最大重量約1t,塔機(jī)需安裝高度40m,選擇北京永茂建筑機(jī)械有限公司生產(chǎn)制造的STT113塔機(jī),其最大工作幅度55m,獨(dú)立高度40m,附著安裝高度167m,最大起重量6t,末端起重量1.00t,額定起重力矩為800kN·m,起升速度080m/min,工作參數(shù)滿足施工要求。2、
38、塔機(jī)平面布置圖本塔機(jī)計(jì)劃安裝在3#樓天井內(nèi),位于3#樓24軸中、H-J軸中,經(jīng)過(guò)與項(xiàng)目部溝通,計(jì)劃9月25日安裝一臺(tái)STT113塔機(jī)施工,完成現(xiàn)場(chǎng)材料垂直運(yùn)輸。(具體位置詳見塔式起重機(jī)平面布置圖)。3、基礎(chǔ)方案塔機(jī)計(jì)劃安裝在地下車庫(kù)內(nèi),塔機(jī)基礎(chǔ)上表面與車庫(kù)基礎(chǔ)上表面持平,塔機(jī)基礎(chǔ)防水做法與車庫(kù)防水做法相同(詳見塔式起重機(jī)基礎(chǔ)圖)。本工程塔機(jī)基礎(chǔ)尺寸為5.6m×5.6m×1.35m,塔機(jī)基礎(chǔ)要求地耐力為167KN/m²,根據(jù)地質(zhì)勘察報(bào)告,塔機(jī)基礎(chǔ)部位的地基承載力為170KN/M2,施工現(xiàn)場(chǎng)地基基礎(chǔ)地耐力符合塔機(jī)基礎(chǔ)地耐力要求?;A(chǔ)混凝土強(qiáng)度等級(jí)C35。4、附著方案因
39、塔機(jī)獨(dú)立高度符合工程需要,故不計(jì)劃安裝附著。三、塔機(jī)設(shè)計(jì)參數(shù)本STT113塔機(jī)為北京永茂建筑機(jī)械有限公司生產(chǎn)制造:最大工作幅度55m,獨(dú)立高度40m,最大起重量6t,末端起重量1.00t,額定起重力矩為800kN·m。塔吊標(biāo)準(zhǔn)節(jié)規(guī)格為1600*1600*3000。STT113塔式起重機(jī)的主要性能參數(shù)序號(hào)工作性能工作參數(shù)1額定起重力矩800kn.m2最大起重量6t3最大幅度起重量1.00t4最大工程幅度55m5 最大鉤下高度40.26/ 166.26m6起升速度080m/min7回轉(zhuǎn)速度00.7r/min8牽引小車速度057r/min9裝機(jī)容量45KVA10整機(jī)重量35T(獨(dú)立高度,不
40、含配重)11平衡重13.9TSTT113塔吊55米起重臂時(shí)的起重性能倍率R(max)mC(max)t25303540455055a=413.366.002.832.251.841.531.291.100.95a=224.153.002.882.301.881.581.341.151.00 STT113塔式起重機(jī)起重性能圖第三節(jié) 施工安排一、塔機(jī)安裝目標(biāo)1、質(zhì)量目標(biāo)1)施工工藝執(zhí)行率100%;2)現(xiàn)場(chǎng)服務(wù)滿意率100%;2、工期目標(biāo)在保證安全、質(zhì)量前提下,本工程單臺(tái)塔機(jī)應(yīng)在 2 天內(nèi)安裝完畢。3、安全管理目標(biāo)1)無(wú)高空墜落事故、觸電事故、起重設(shè)備坍塌事故及重傷事故的發(fā)生。2)輕傷負(fù)傷率控制在萬(wàn)分
41、之一之內(nèi)。二、安裝組織管理機(jī)構(gòu)1、根據(jù)施工合同或協(xié)議的要求、對(duì)塔機(jī)安裝全過(guò)程進(jìn)行管理和監(jiān)控,確保質(zhì)量目標(biāo)、工期目標(biāo)的實(shí)現(xiàn),確定如下組織機(jī)構(gòu),并明確分工職責(zé): 項(xiàng)目負(fù)責(zé)人田家玉安全員劉凱技術(shù)負(fù)責(zé)人崔傳忠施工工長(zhǎng)于修河塔機(jī)安裝班組負(fù)責(zé)人王峰電 工1人塔機(jī)拆裝4人塔機(jī)司機(jī)1人起重指揮1人 2、職責(zé)分工職 務(wù)姓 名工 作 職 責(zé)管理人員職責(zé)分工項(xiàng)目負(fù)責(zé)人崔傳忠負(fù)責(zé)整個(gè)項(xiàng)目實(shí)施,保證工期、質(zhì)量安全處于受控狀態(tài)。技術(shù)負(fù)責(zé)人崔傳忠負(fù)責(zé)技術(shù)方案制定,確保方案的正確性,科學(xué)性和可行性。施工工長(zhǎng)于修河負(fù)責(zé)設(shè)備安裝的管理,對(duì)安裝過(guò)程中出現(xiàn)的問(wèn)題及存在的隱患,提出防范措施,采取應(yīng)急措施,組織落實(shí),杜絕事故發(fā)生。安全員
42、劉 凱落實(shí)安全責(zé)任制度,負(fù)責(zé)檢查,監(jiān)督現(xiàn)場(chǎng)人、機(jī)、物安全性、可靠性,制止違章作業(yè),消除可能存在的安全隱患。安拆負(fù)責(zé)人王 峰負(fù)責(zé)現(xiàn)場(chǎng)的吊裝總指揮;負(fù)責(zé)每日的工作安排,安全交底、工作記錄,嚴(yán)格執(zhí)行施工方案,制止任何違章作業(yè)。安裝人員職責(zé)分工安拆工4人嚴(yán)守工作紀(jì)律,服從正確安排,正確使用勞保用品,防護(hù)齊全,嚴(yán)守工作崗位,嚴(yán)格遵循操作規(guī)程。起重指揮1人負(fù)責(zé)檢查吊具、索具安全性,保證吊點(diǎn)正確,物件平穩(wěn),指揮信號(hào)清晰、明確。塔吊司機(jī)1人嚴(yán)守操作規(guī)程,嚴(yán)格按照日常保養(yǎng)維護(hù)檢查,確保塔吊處于良好狀態(tài)。電 工1人嚴(yán)守操作規(guī)程和措施,不違章作業(yè),不冒險(xiǎn)蠻干,有權(quán)拒絕違章指揮;不拆除安裝現(xiàn)場(chǎng)各類電氣安全防護(hù)設(shè)施。第
43、四節(jié) 施工準(zhǔn)備及資源配置計(jì)劃一、施工準(zhǔn)備1、技術(shù)準(zhǔn)備技術(shù)人員提前進(jìn)行現(xiàn)場(chǎng)實(shí)地勘測(cè),仔細(xì)地考慮在安裝及今后拆卸中可能碰到的問(wèn)題,制定切實(shí)可行的施工方案,對(duì)疑難問(wèn)題及時(shí)同項(xiàng)目部溝通,共同商討解決對(duì)策,確保施工順利安全的進(jìn)行。2、現(xiàn)場(chǎng)準(zhǔn)備(1)為滿足塔機(jī)安裝及正常使用,配備符合安全要求的專用配電箱,并距塔機(jī)中心不大于3m,STT113型塔機(jī)正常工作需用電容量為:45kw(2)清理進(jìn)場(chǎng)道路,清理回填并夯實(shí)塔機(jī)基礎(chǔ)20m范圍內(nèi)的場(chǎng)地,以便于進(jìn)場(chǎng)塔機(jī)部件的擺放和選擇汽車吊的就位點(diǎn)。3、資料準(zhǔn)備(1)在塔機(jī)進(jìn)場(chǎng)安裝前,使用單位(施工項(xiàng)目部)須向安裝單位提供以下有關(guān)基礎(chǔ)資料:(2)砼基礎(chǔ)的強(qiáng)度報(bào)告,(要求達(dá)到
44、100%以上);(3)砼基礎(chǔ)隱蔽工程驗(yàn)收資料;(鋼筋原材質(zhì)保書、鋼筋綁扎施工驗(yàn)收單);(4)基礎(chǔ)地耐力證明;(5)基礎(chǔ)驗(yàn)收?qǐng)?bào)告;(6)預(yù)埋固定支腳水平度測(cè)量報(bào)告;(7)安裝單位、產(chǎn)權(quán)單位、使用單位、監(jiān)理單位四方進(jìn)行塔機(jī)基礎(chǔ)驗(yàn)收,各方在驗(yàn)收表上簽字認(rèn)定并報(bào)施工監(jiān)理簽字后,方可進(jìn)行安裝作業(yè)。二、資源配置計(jì)劃1、物資配置計(jì)劃根據(jù)STT113塔機(jī)安裝需要,必備的施工設(shè)備、機(jī)具及安全防護(hù)用品如下:(1)施工機(jī)械:序號(hào)設(shè)備名稱規(guī)格型號(hào)單位數(shù)量備注1汽車吊50噸臺(tái)1(2)工具及索具:序號(hào)名 稱規(guī)格型號(hào)單位數(shù)量備 注1手動(dòng)葫蘆5 t個(gè)22專用工具主要是扳手套1隨機(jī)配置3安 全 帽頂104安 全 帶條105起重
45、用鋼絲繩6×19-1550-18根4長(zhǎng)度L = 4 m6起重用鋼絲繩6×19-1550-18根4長(zhǎng)度L = 8 m7起重用鋼絲繩6×19-1550-32根4長(zhǎng)度L = 8 m8卸 扣5噸 個(gè)49卸 扣2噸 個(gè)410撬 棍30根212大 錘18磅把413麻 繩18米5014鐵 絲8號(hào)公斤1015沖 銷24根2長(zhǎng)度L = 300mm16勞保用品手套、防滑鞋等套若干根據(jù)需要配置注意:對(duì)所使用的索具、吊具進(jìn)行全面的安全檢查,確認(rèn)完好無(wú)損方可使用第五節(jié) 施工工藝要求一、安裝工藝流程塔機(jī)基礎(chǔ)施工及驗(yàn)收安全技術(shù)交底及作業(yè)準(zhǔn)備吊裝設(shè)備選用安裝3節(jié)標(biāo)準(zhǔn)節(jié)安裝頂升套架回轉(zhuǎn)總成的安裝塔
46、頭安裝平衡臂安裝安裝起重臂安裝配重穿繞鋼絲繩接通電源及試運(yùn)行安全裝置調(diào)試頂升加節(jié)塔吊試機(jī)驗(yàn)收及投入使用附墻架安裝頂升加節(jié)。二、操作要點(diǎn)1、塔機(jī)基礎(chǔ)施工及驗(yàn)收固定式塔式起重機(jī)的地基基礎(chǔ)是保證塔機(jī)安全使用的必要條件,要求該基礎(chǔ)分別按不同地質(zhì)情況嚴(yán)格按照規(guī)定執(zhí)行,對(duì)基礎(chǔ)的基本要求如下:(1)基礎(chǔ)的土質(zhì)應(yīng)堅(jiān)固牢實(shí);工程勘測(cè)報(bào)告的地基承載能力為170KN/m² (17噸/平方米),塔機(jī)基礎(chǔ)要求地耐力為167KN/m²,地基基礎(chǔ)地耐力符合塔機(jī)地耐力要求。挖槽后,應(yīng)對(duì)基礎(chǔ)底面進(jìn)行釬探,留有釬探記錄,施工單位和監(jiān)理單位共同對(duì)釬探記錄進(jìn)行評(píng)價(jià),提出處理意見。基礎(chǔ)鋼筋按說(shuō)明書基礎(chǔ)圖的要求進(jìn)行施
47、工,底腳螺栓的位置和尺寸,必須正確,固定牢固,不得移位、不得下沉、不得漏裝、不得焊接、不得損傷。(2)混凝土基礎(chǔ)座應(yīng)有良好的排水設(shè)施。(3)塔機(jī)基礎(chǔ)尺寸為5.6m×5.6m×1.35m。砼型號(hào)不得低于C30,基礎(chǔ)的配筋如下圖。(4)砼基礎(chǔ)表面校水平,平面度允差小于1/500。(6)地腳螺栓及可拆卸支腿分布圖:1 地腳螺栓 2 雙螺母 3 平墊圈 4 地腳2、吊裝設(shè)備選用(1)STT113塔吊各部件重量參數(shù)序號(hào)名 稱重量(kg)吊裝注意事項(xiàng)1套架30002標(biāo)準(zhǔn)節(jié)11003塔頭3710含司機(jī)室4回轉(zhuǎn)機(jī)構(gòu)總成4550含引進(jìn)梁5平衡臂總成4965不含卷?yè)P(yáng)機(jī)重量1000kg6起重臂總
48、成773355米起重臂重量(不含變幅機(jī)構(gòu)重量)7平衡重139203塊2700kg、1塊3420kg、1塊2400kg組成(2)汽車吊起重量性能表選用QY50全液壓汽車起重機(jī)進(jìn)行塔機(jī)的吊裝作業(yè),QY50汽車起重機(jī)性能參數(shù)如下表:QY50(徐州)汽車起重機(jī)性能參數(shù)表(一)臂長(zhǎng)1118.52633.5工作半徑(m)起重量(t)起升高度(m)起重量(t)起升高度(m)起重量(t)起升高度(m)起重量(t)起升高度(m)3.050.011.24.038.010.725.018.85.030.510.025.018.56.024.09.221.418.114.026.07.018.58.218.017.6
49、13.025.710.033.58.014.56.814.017.011.525.410.033.39.011.54.611.516.410.224.99.433.010.09.615.79.224.58.432.611.07.914.88.324.07.632.212.06.613.87.523.46.9531.813.05.612.76.522.76.3531.414.04.711.35.722.05.8530.915.04.09.65.0121.35.430.316.03.47.34.520.44.829.718.03.318.43.828.420.02.515.83.326.922.0
50、1.912.42.425.024.01.8522.926.01.4520.328.01.0517.1QY50(徐州)汽車起重機(jī)性能參數(shù)表(二)條件支腿全伸(前方區(qū)、沿全圓周360º)(t)工作半徑(m) 11主臂18.5m主臂26 m主臂33.5 m主臂3.050.03.543.04.038.025.04.534.025.05.030.525.05.524.023.014.06.019.018.014.06.515.514.514.07.013.012.013.010.07.511.010.011.510.08.09.08.510.010.09.07.06.57.58.010.04.
51、96.06.011.03.54.85.012.02.83.84.013.02.03.03.314.01.52.42.615.01.01.92.216.06.71.51.918.00.851.23、安裝3節(jié)標(biāo)準(zhǔn)節(jié)首先把制作基礎(chǔ)時(shí)定位框打出,然后用汽車吊把標(biāo)準(zhǔn)節(jié)吊起,放到預(yù)埋角鋼,插入銷軸1、2(如圖一所示),并開上開口銷,按如上順序再安裝3節(jié)標(biāo)準(zhǔn)節(jié)。圖二圖一圖一4、安裝頂升套架在地面上將套架零部件安裝到頂升套架上,然后用兩根鋼絲繩對(duì)折后拴在四角的銷軸內(nèi),起吊將組裝好的頂升套架吊放在標(biāo)準(zhǔn)節(jié)外,用掛靴將其固定在底部標(biāo)準(zhǔn)節(jié)上(如圖二所示)。5、回轉(zhuǎn)總成的安裝:回轉(zhuǎn)總成安裝包括回轉(zhuǎn)上、下支座,回轉(zhuǎn)支撐,
52、引進(jìn)梁,回轉(zhuǎn)機(jī)構(gòu)等,在地面上將以上零部件組裝好后,用吊索吊掛回轉(zhuǎn)上支座的4個(gè)耳座,找好平衡后將其吊至標(biāo)準(zhǔn)節(jié)上,分別打入直徑65銷軸,穿入直徑20銷軸,與塔身連接,注意引進(jìn)梁的方向與套架前部相一致(如圖三所示)。圖三6、塔頭安裝:在地面上將塔頭組裝完畢,選擇好吊點(diǎn)(如圖四所示),將塔頭垂直吊起放入回轉(zhuǎn)上支座的耳座中(注意塔頭的安裝方向:即司機(jī)室與回轉(zhuǎn)機(jī)構(gòu)不在同一側(cè)),然后在四個(gè)角分別打入螺紋銷軸、園墊,用槽型螺母分別將螺紋銷軸、園墊緊固,插入開口銷鎖緊定。圖 四 圖四7、平衡臂安裝:將平衡臂(4)整體吊起,使其成傾斜狀態(tài),尾部高蹺,吊至塔頭(5)的頂部,使平衡臂(4)耳板放入塔頭耳板(5)和連扳
53、(6)中,再插入銷軸(7)并用鎖銷(8)和開口銷(9)將其固定,然后用銷軸(1)把拉桿(2)、(3)連接,并用開口銷固定,慢慢降下吊臂,使拉桿受力(如圖五所示)。再用專用吊具吊裝一塊平衡重安裝在平衡臂尾部(如圖六所示) 圖五圖六圖六8、在地面上按照說(shuō)明書中的組裝順序?qū)⑵鹬乇?節(jié)用銷軸和螺栓組裝,將變幅小車安裝在第一節(jié)起重臂架上并固定牢固。起重臂架組裝順序如下表:臂架順序12345678臂架編號(hào)LJ1002ALJ1003LJ1004LJ1005LJ1507LJ1508ALJ1508A臂頭將起重臂掛好吊裝繩,55米臂長(zhǎng)時(shí)兩吊點(diǎn)位置分別在19.5米和25.6米處(從臂根處量);試吊是否平衡,否則可適
54、當(dāng)移動(dòng)掛繩位置,起吊吊臂總成至塔頭,將臂架與塔頭的聯(lián)板連接并用開口銷鎖固,再將臂架下弦的耳板放入塔頭的耳板,然后用銷軸把臂架鎖固在塔頭上,并用開口銷鎖固。將剩余平衡重依次用專用工具吊至平衡臂配重位置,用銷軸固定在平衡臂配重位置。圖七9、安裝配重:55米起重臂安裝配重重量為13.9噸,配重型號(hào)為3塊2700Kg 1塊3420Kg和1快2400kg的,配重塊位置(如圖八所示)。 圖八 首先將吊索繩穿入吊耳1中,吊起配重塊,將平衡臂上的銷軸2插入配重塊孔3內(nèi)。逐一按此方法安裝其余配重,然后將檔桿4用銷軸將其鎖固在A處,將檔桿5穿入平衡臂兩側(cè)B孔內(nèi),以固定配重。到此塔吊安裝已不需要汽車吊,有電工對(duì)塔吊
55、接電,隨后穿繞各種鋼絲繩及調(diào)試限位。10、穿繞鋼絲繩:(1)鋼絲繩規(guī)格:起升鋼絲繩(35Wx7+1WS-1960-12)起升高度m倍 率鋼絲繩長(zhǎng)度m備注最大起升高度23004300附著高度2根據(jù)附著高度確定起升機(jī)構(gòu)24YQL15鋼絲繩最小破斷拉力8.25t容繩量390m變幅鋼絲繩(6x19-1870-7.7)臂架長(zhǎng)度變幅前繩長(zhǎng)度m變幅后繩長(zhǎng)度m備注55m11075(2)變幅鋼絲繩的穿繞:穿繞方法如圖所示,首先將變幅繩的后繩一端鎖在變幅卷筒1上,從下端出繩,經(jīng)臂架滑輪4、用鋼絲繩夾鎖在變幅小車?yán)K輪9上。變幅繩的前繩2一端鎖在變幅卷筒1上,從下端出繩,經(jīng)臂架滑輪5、6、7鎖在變幅小車的張緊輪8上。
56、 (3)起升機(jī)構(gòu)繞繩方法:鋼絲繩從起升機(jī)構(gòu)卷筒上放出,進(jìn)入起重臂內(nèi)臂架上滑輪依次向前穿繞各滑輪到臂端頭起重繩滑輪,再繞到變幅小車和吊鉤滑輪組,最后將繩頭通過(guò)楔與楔套,用銷軸固定在塔頭上的捋直器重量限制器裝置上。至此塔吊安裝完畢,進(jìn)行限位調(diào)試,調(diào)試完畢后進(jìn)行塔吊頂升。 11、接通電源及試運(yùn)轉(zhuǎn):整機(jī)安裝完畢后,應(yīng)檢查塔身的垂直度,允差為4/1000;再按電路圖的要求接通所有電路的電源,同時(shí)檢查各處鋼絲繩是否處于正常工作狀態(tài),遇有機(jī)構(gòu)結(jié)構(gòu)摩擦鋼絲繩應(yīng)予以排除。調(diào)試好各限位器,使其正常工作且應(yīng)靈敏可靠。12、頂升加節(jié)(1)將一節(jié)標(biāo)準(zhǔn)節(jié)與引進(jìn)小車用螺栓連接,吊起帶有標(biāo)準(zhǔn)節(jié)的引進(jìn)小車,將其送進(jìn)引進(jìn)梁上。(
57、2)將小車開到起重臂29米處,使塔機(jī)處于平衡狀態(tài);當(dāng)塔機(jī)未處于最佳平衡狀態(tài)時(shí),可適當(dāng)前后移動(dòng)小車,使塔機(jī)達(dá)到最佳平衡狀態(tài)。(3)使用回轉(zhuǎn)機(jī)構(gòu)上的回轉(zhuǎn)制動(dòng)器,將塔機(jī)上部機(jī)構(gòu)處于回轉(zhuǎn)制動(dòng)狀態(tài),不允許有回轉(zhuǎn)運(yùn)動(dòng)。拆除塔身頂部與下支座的8根銷軸。(4)將頂升掛板掛在距離最近的一組標(biāo)準(zhǔn)節(jié)踏步的槽內(nèi),插入安全銷。確認(rèn)無(wú)誤后,開動(dòng)液壓系統(tǒng),使活塞桿伸出,將爬升架及其以上的部分頂起1050毫米時(shí)停止,檢查頂升掛板、爬升架等傳力部分是否有異響、變形、油缸活塞桿是否有自動(dòng)回縮等異常現(xiàn)象,確認(rèn)正常后,繼續(xù)頂長(zhǎng)。(5)頂起超過(guò)1/3標(biāo)準(zhǔn)節(jié)高度并使爬升架上的換步頂桿位于下一個(gè)踏步上方,停止頂升,并回縮油缸,使換步頂桿落
58、在低位的踏步上。(6)確認(rèn)兩個(gè)換步頂桿都準(zhǔn)確地壓在踏步槽上并承受爬升架及其以上部分的重量后,拔出安全銷,將油缸活塞全部縮回,頂升掛板上升,然后掛在上方最近的一組踏步槽內(nèi),插入安全銷。(7)再次伸出油缸,使座落在踏步上的換步頂桿上升至踏步。(8)停止頂升,并回縮油缸,使換步頂桿落在踏步上。(9)確認(rèn)兩個(gè)換步頂桿都準(zhǔn)確地壓在踏步槽上并承受爬升架及其以上部分的重量后,拔出安全銷,將油缸活塞全部縮回,頂升掛板上升,然后掛在上方最近的一組踏步槽內(nèi)。插入安全銷。此時(shí)已頂起2/3個(gè)標(biāo)準(zhǔn)節(jié)。(10)頂升掛板掛在踏步槽內(nèi)后,伸出油缸,將塔機(jī)的上部結(jié)構(gòu)再頂起超過(guò)1/3個(gè)標(biāo)準(zhǔn)節(jié)高度,此時(shí)塔身上方應(yīng)有能裝入一個(gè)標(biāo)準(zhǔn)節(jié)
59、的空間。(11)用引進(jìn)小車將標(biāo)準(zhǔn)節(jié)引至塔身正上方,緩慢回縮油缸,使引進(jìn)小車的下面與標(biāo)準(zhǔn)節(jié)連接頭接觸,再縮回油缸,對(duì)正下支座與標(biāo)準(zhǔn)節(jié)連接銷孔,每個(gè)接頭處插入一根安裝用的臨時(shí)銷軸。此時(shí)引起小車已與引進(jìn)梁脫開。(12)伸出油缸,引進(jìn)小車重新落在引進(jìn)梁上,繼續(xù)伸出油缸,直至引進(jìn)小車與下支座相連接的標(biāo)準(zhǔn)節(jié)脫開,推出引進(jìn)小車,縮回油缸,對(duì)齊新引進(jìn)的標(biāo)準(zhǔn)節(jié)與原標(biāo)準(zhǔn)節(jié)的連接銷孔,插入8根標(biāo)準(zhǔn)銷軸,敲擊直至軸肩緊貼弦桿表面,在銷軸上裝上防轉(zhuǎn)套后再插入小銷軸及彈簧銷。(13)拔出安裝用臨時(shí)銷軸,再縮回油缸,對(duì)齊下支座與新引進(jìn)標(biāo)準(zhǔn)節(jié)連接銷孔,插入8根¢60無(wú)肩軸銷軸,敲擊入孔,在銷軸的一端插入小銷軸及彈簧
60、銷,在另一端裝上防轉(zhuǎn)套后再插入小銷軸及彈簧銷。(14)至此完成一個(gè)標(biāo)準(zhǔn)節(jié)的加節(jié)工作,重復(fù)以上步驟,直至加節(jié)到40米高度。13、塔機(jī)附墻因塔機(jī)標(biāo)準(zhǔn)高度能夠滿足過(guò)程需要,故不安裝附著。三、安裝質(zhì)量要求及自檢驗(yàn)收安裝質(zhì)量要求及自檢驗(yàn)收 檢查項(xiàng)目檢 查 內(nèi) 容底 架檢查地腳支腿與標(biāo)準(zhǔn)節(jié)的銷軸聯(lián)接情況,開口銷安裝的正確性檢查輸電線距塔機(jī)最大旋轉(zhuǎn)部分的安全距離檢查電纜通過(guò)情況,以防損壞塔 身檢查標(biāo)準(zhǔn)節(jié)連接螺栓的緊固情況,標(biāo)準(zhǔn)節(jié)與標(biāo)準(zhǔn)節(jié)的銷軸聯(lián)接情況,開口銷安裝的正確性通 道檢查梯子及護(hù)身欄的安裝,更換損壞件引 進(jìn) 梁將引進(jìn)梁折靠在標(biāo)準(zhǔn)節(jié)的一側(cè)。爬 升 架檢查與下支座的連接情況檢查滾輪、活動(dòng)爬爪是否靈活可靠
61、,連接是否牢固檢查走道,欄桿的緊固情況務(wù)必將頂升套架降至底部(如有附墻,請(qǐng)將頂升套架降至附墻框位置)上、下支座司 機(jī) 室檢查與回轉(zhuǎn)支承連接的螺栓緊固情況檢查電纜的通行情況檢查平臺(tái),欄桿的緊固情況檢查司機(jī)室的連接情況司機(jī)室內(nèi)嚴(yán)禁存放潤(rùn)滑油、油棉紗及其它易燃物品起 重 臂檢查各處連接銷軸、墊圈、開口銷安裝的正確性檢查載重小車安裝運(yùn)行情況,載入吊籃的緊固情況檢查起升、變幅鋼絲繩的纏繞及緊固情況檢查安全繩是否已在起重臂和塔頭撐架上安裝好平 衡 臂檢查平衡臂的固定情況檢查平衡臂欄桿及走道的安裝情況,保證走道無(wú)雜物吊 具檢查換倍率裝置,吊鉤的防脫繩裝置是否安全可靠檢查吊鉤組有無(wú)影響使用的缺陷檢查起升、變幅
62、鋼絲繩的規(guī)格、型號(hào)是否符合要求檢查綱絲繩的磨損情況機(jī) 構(gòu)檢查各機(jī)構(gòu)的安裝、運(yùn)行情況檢查各機(jī)構(gòu)的制動(dòng)器間隙調(diào)整是否合適當(dāng)載重小車分別運(yùn)行到最小或最大幅度處時(shí)牽引機(jī)構(gòu)卷筒上鋼絲繩是否有3圈以上安全圈檢查各鋼絲繩頭的壓緊有無(wú)松動(dòng)安全裝置檢查各安全保護(hù)裝置是否按本說(shuō)明書的要求調(diào)整合格檢查塔機(jī)上所有扶梯、欄桿、休息平臺(tái)的安裝緊固情況潤(rùn) 滑根據(jù)使用說(shuō)明書檢查潤(rùn)滑情況第六節(jié) 安全措施及注意事項(xiàng)一、安裝作業(yè)活動(dòng)危險(xiǎn)辨識(shí)安拆活動(dòng)危險(xiǎn)評(píng)價(jià)表序號(hào)人員和作業(yè)過(guò)程可能發(fā)生的危險(xiǎn)危險(xiǎn)評(píng)價(jià)風(fēng)險(xiǎn)等級(jí)是否控制LECD1安拆平衡重A.作業(yè)人員高空墜落B.高空落物C.物體打擊3415180是2安拆起升鋼絲繩A.作業(yè)人員高空墜落B.
63、鋼絲繩滑落3415180是3起重臂、平衡臂安拆A.作業(yè)人員高空墜落B.起重事故3610180是4爬升架及液壓頂升機(jī)構(gòu)安拆A.作業(yè)人員高空墜落B.起重事故25770是5塔吊標(biāo)準(zhǔn)節(jié)安拆A.作業(yè)人員高空墜落B.起重事故25770是6設(shè)備運(yùn)輸至現(xiàn)場(chǎng)A.車輛傷害25770是7施工準(zhǔn)備和施工配合A.擠壓和碰撞傷害B.車輛傷害25770是8作業(yè)人員高空移動(dòng)A.作業(yè)人員高空墜落2615160是9高空作業(yè)A.高空落物和物體打擊25770是注:采用公式:D=LEC 式中:D-崗位危險(xiǎn)源危險(xiǎn)性(危險(xiǎn)程度);L-發(fā)生事故的可能性;E-人體暴露在此種危險(xiǎn)環(huán)境的頻繁程度;C-一旦發(fā)生事故會(huì)造成的損失后果。二、安全風(fēng)險(xiǎn)控制
64、安全風(fēng)險(xiǎn)控制對(duì)策表序號(hào)危險(xiǎn)危險(xiǎn)點(diǎn)描述擬采用的安全技術(shù)措施負(fù)責(zé)人結(jié)果1高空墜落作業(yè)人員高空移動(dòng)時(shí)踩空、抓脫或受其他干擾時(shí)墜落作業(yè)人員系掛安全帶,移動(dòng)時(shí)掛保險(xiǎn)繩劉凱作業(yè)人員高處作業(yè)時(shí)墜落作業(yè)人員高處作業(yè)時(shí)必須系安全帶或保險(xiǎn)繩劉凱作業(yè)人員身體原因?qū)е赂呖諌嬄渥鳂I(yè)人員身體狀況良好劉凱環(huán)境因素導(dǎo)致的高空墜落專人負(fù)責(zé)收集氣象資料惡劣天氣停止作業(yè)劉凱安全帶或保險(xiǎn)繩斷開使作業(yè)人員墜落作業(yè)前對(duì)安全帶和保險(xiǎn)繩進(jìn)行檢查;作業(yè)人員作業(yè)時(shí)不得以安全帶和保險(xiǎn)繩作為支持;作業(yè)過(guò)程中防止損傷安全帶和保險(xiǎn)繩劉凱2高空落物高處作業(yè)時(shí)使用的工具和安裝時(shí)的銷軸放置不當(dāng)從高空墜落高處作業(yè)時(shí)必須將工具和安裝時(shí)的銷軸放到工具袋中,較大的工
65、具必須系保險(xiǎn)繩王峰保險(xiǎn)繩斷開、工具袋撕裂造成工具和銷軸從高處墜落檢查保險(xiǎn)繩和工具袋應(yīng)無(wú)損傷,安裝時(shí)的銷軸應(yīng)及時(shí)安裝王峰被吊物件捆綁不可靠造成物件墜落由專人操作,起吊前要認(rèn)真檢查捆綁情況王峰3物體打擊高空落物造成地面人員和無(wú)關(guān)人員的傷害設(shè)安裝警戒區(qū),地面作業(yè)人員要避開塔吊下方并注意塔吊上的作業(yè)情況,無(wú)關(guān)人員嚴(yán)禁進(jìn)入警戒區(qū)王峰4起重事故起重機(jī)傾覆控制起重負(fù)荷,嚴(yán)禁歪拉斜吊王峰被吊物脫落專人捆綁,專人檢查王峰鋼絲繩斷開保證鋼絲繩安全系數(shù),檢查鋼絲繩應(yīng)無(wú)損傷王峰重物擠壓碰撞操作人員不得站在物體運(yùn)動(dòng)的前方和死角,操作司機(jī)要聽專人指揮、操作穩(wěn)妥。王峰5塔吊倒塌塔吊在安拆過(guò)程中傾覆或垮塌嚴(yán)格按照安裝作業(yè)措施
66、進(jìn)行施工,嚴(yán)密監(jiān)視氣象條件王峰6交通事故運(yùn)輸車輛造成人員傷害,損壞設(shè)備裝車平穩(wěn),支墊可靠,精心操作,控制車速王峰7擠壓碰撞在安拆作業(yè)過(guò)程中、在捆綁過(guò)程中,在運(yùn)輸裝卸過(guò)程中、在吊放作業(yè)過(guò)程中等造成的人員擠壓碰狀傷害注意力集中,精心操作,專人指揮,嚴(yán)禁違章指揮、違章作業(yè)王峰三、塔吊安裝安全措施1、安裝作業(yè)之前,組織學(xué)習(xí)安拆安全技術(shù)方案,對(duì)班組作業(yè)人員進(jìn)行技術(shù)方案交底,對(duì)分項(xiàng)工作內(nèi)容、技術(shù)要求、安全措施以及注意事項(xiàng)等進(jìn)行單獨(dú)交底。2、作業(yè)人員必須經(jīng)過(guò)培訓(xùn)考核合格,司機(jī)、吊裝指揮、電工及檢驗(yàn)人員要持證上崗;進(jìn)入作業(yè)現(xiàn)場(chǎng)必須戴安全帽,高空作業(yè)時(shí)要系好安全帶,著防滑鞋,雨季應(yīng)采取防滑措施。3、作業(yè)人員必須
67、遵守高空作業(yè)規(guī)則,嚴(yán)禁酒后上崗及高空拋物等一些不安全行為,安裝基本塔時(shí)遇六級(jí)風(fēng)以上禁止作業(yè)。4、套架、回轉(zhuǎn)支承座、平衡臂、起重臂等大件吊裝作業(yè)前,現(xiàn)場(chǎng)負(fù)責(zé)人必須進(jìn)行專項(xiàng)安全技術(shù)交底,每次起吊離地面20mm左右時(shí)必須停機(jī),檢查安全平穩(wěn)性,確認(rèn)安全可靠方能繼續(xù)起吊。5、對(duì)長(zhǎng)大物件吊掛點(diǎn)應(yīng)準(zhǔn)確,保證被吊物件平衡,起吊前應(yīng)先用穩(wěn)固繩把兩端栓牢,防止重物旋轉(zhuǎn)、擺動(dòng)和碰撞。6、安裝作業(yè)區(qū)(5-10)米范圍外應(yīng)設(shè)安全警戒線,工地派專人把守,非有關(guān)人員不得進(jìn)入警戒線,專職安全員應(yīng)隨時(shí)檢查各崗人員的安全情況,夜間作業(yè),應(yīng)有良好的照明。7、安裝人員要工作崗位明確,作業(yè)職責(zé)明確,既要堅(jiān)守崗位,又要互相配合,自覺(jué)遵守
68、安全操作規(guī)程及塔機(jī)安全技術(shù)措施規(guī)定,集中精力,全神貫注的工作。四、塔吊安裝注意事項(xiàng)1、全體人員必須嚴(yán)格遵守施工現(xiàn)場(chǎng)各項(xiàng)安全規(guī)章制度。2、施工人員均穿戴好安全用具,高空作業(yè)尤其要注意,安全帶要系牢于身體上部牢固構(gòu)件上。3、高空作業(yè)不得上下拋物件,各類安全用具及配件均應(yīng)用工具袋或吊藍(lán),并用繩子吊上,放置于安全的地方。4、施工現(xiàn)場(chǎng)設(shè)紅白帶警戒線,并有專人監(jiān)督。5、施工人員應(yīng)集中思想,聽從專人指揮,吊運(yùn)構(gòu)件應(yīng)緩慢,構(gòu)件起吊過(guò)程應(yīng)用繩牽引,防止空中轉(zhuǎn)動(dòng)。6、吊索具應(yīng)有6倍以上安全系數(shù),捆綁用鋼絲繩應(yīng)有10倍以上安全系數(shù)。7、各類器具使用前均應(yīng)嚴(yán)格檢查,以防不測(cè)。8、塔機(jī)在頂升標(biāo)準(zhǔn)節(jié)過(guò)程必須鎖住回轉(zhuǎn)制動(dòng)器,禁止作回轉(zhuǎn)動(dòng)作。9、在頂升標(biāo)準(zhǔn)節(jié)過(guò)程中應(yīng)有專人指揮,指揮信號(hào)明確,遠(yuǎn)距離指揮應(yīng)使用對(duì)講機(jī)。10、液壓操作人員應(yīng)集中精神,小心操作。11、四級(jí)以上風(fēng)力禁止頂升標(biāo)準(zhǔn)節(jié)作業(yè),大雨禁止高空安裝作業(yè)。12、起重人員應(yīng)明確構(gòu)件重量后方可起吊。13、全體施工人員必須遵循文明施工原則,做好落手清工作。第七節(jié) 試驗(yàn)與驗(yàn)收塔機(jī)安全裝置主要包括:行程限位器和載荷限制器。行程限位器有:起升高度限位器、回轉(zhuǎn)限位器、幅度限位器。載荷限制器有:起重力矩限制器、起重量限制器。一、限制器的調(diào)整1、回轉(zhuǎn)限制器的調(diào)試:開動(dòng)回轉(zhuǎn)機(jī)構(gòu)使電源電纜線處于不打鉸狀態(tài)。使起重
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 農(nóng)業(yè)文化遺產(chǎn)可視化知識(shí)圖譜構(gòu)建
- 煤氣化渣二氧化硅對(duì)聚丙烯除味性能的研究與應(yīng)用
- 公園生活垃圾管理辦法
- 十年職場(chǎng)經(jīng)驗(yàn)分享與職業(yè)規(guī)劃
- 江西涉密采購(gòu)管理辦法
- 通信工程技術(shù)規(guī)范
- 積極心理學(xué)應(yīng)用:心理健康教育長(zhǎng)效機(jī)制構(gòu)建
- 利率市場(chǎng)化改革對(duì)中小企業(yè)融資效率的影響機(jī)制研究
- 基于乘客決策行為的城市軌道交通系統(tǒng)韌性評(píng)估研究
- 2025年 重大安全事故
- 中職《接觸器聯(lián)鎖正反轉(zhuǎn)控制線路》公開課PPT
- 05-衣之鏢-輔行訣湯液經(jīng)法用藥圖釋義
- LS/T 3240-2012湯圓用水磨白糯米粉
- GB/T 15298-1994電子設(shè)備用電位器第一部分:總規(guī)范
- 新教科版六下科學(xué)4-6《生命體中的化學(xué)變化》教案
- 2023高中學(xué)業(yè)水平合格性考試歷史重點(diǎn)知識(shí)點(diǎn)歸納總結(jié)(復(fù)習(xí)必背)
- 自然指數(shù)NatureIndex(NI)收錄的68種自然科學(xué)類期刊
- 手術(shù)報(bào)告審批單
- 《專業(yè)導(dǎo)論光電信息科學(xué)與工程》教學(xué)大綱
- 廣東省湛江市各縣區(qū)鄉(xiāng)鎮(zhèn)行政村村莊村名明細(xì)
- 少兒美術(shù)國(guó)畫- 少兒希望 《紫藤課件》
評(píng)論
0/150
提交評(píng)論