




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、 上海通用汽車對供應(yīng)商質(zhì)量要求的規(guī)定-SGM供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊上海通用汽車采購部供應(yīng)商質(zhì)量及開發(fā)科2004年10月18日第一版 SGM-供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊目 錄一、 GM供應(yīng)商質(zhì)量聲明二、 APQP三、 FE四、 PPAP五、 GP12六、 PTR/斷點七、 控制計劃審核八、 PRR九、 受控發(fā)運十、 產(chǎn)品與體系審核十一、 持續(xù)改進十二、 供應(yīng)商易地生產(chǎn)十三、 年度優(yōu)秀供應(yīng)商評選十四、 說明十五、 附件 SGM-供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊一、 供應(yīng)商質(zhì)量聲明:1. Supplier Quality Base Requirements:供應(yīng)商質(zhì)量基本要求:(From Gen
2、eral Terms and Conditions Seller agrees to participate in Buyers supplier quality and development program(s and to comply with all quality requirements and procedures specified by Buyer, as revised from time to time, including those applicable to Seller as set forth in Quality System Requirements QS
3、-9000. In addition, Buyer shall have the right to enter Sellers facility at reasonable times to inspect the facility, goods, materials and any property of Buyer covered by this contract. Buyers inspection of the goods, whether during manufacture, prior to delivery or within a reasonable time after d
4、elivery, shall not constitute acceptance of any work-in-process or finished goods.(一般條款和條件供應(yīng)商應(yīng)同意買方制定的供應(yīng)商質(zhì)量和開發(fā)程序并遵守買方列出的所有質(zhì)量要求和程序(有時會修訂,以及QS9000質(zhì)量體系提出的對供應(yīng)商適用的要求. 除此之外,買方有權(quán)隨時進入供應(yīng)商的設(shè)施來檢查設(shè)備,產(chǎn)品,材料和合同規(guī)定的SGM所有物. 無論在制造期間,發(fā)運之前還是在發(fā)運后的某段時間,買方對產(chǎn)品的檢查,不能夠免除供應(yīng)商對在制品或成品檢查的責任。All suppliers are expected to supply part
5、s to General Motors with zero defects. Parts shall meet all engineering specifications and function with no abnormalities according to intent.所有供應(yīng)商應(yīng)該向通用公司提供零缺陷的零件。零件應(yīng)滿足所有工程規(guī)范和功能要求,以及顧客的其它特殊要求。Funding is to be identified in the initial quote and subsequent quotes to reflect error occurrence detection
6、 (poka yoke, error proofing devices, etc and defect outflow prevention to customers.Controls implemented at a later date are the financial responsibility of the supplier.在首次報價和其后的報價中,供應(yīng)商需要說明為檢測缺陷 (防錯裝置等 和防止缺陷流向顧客所需要的預(yù)算。供應(yīng)商以后追加的控制手段,費用由供應(yīng)商承擔。2. ISO/TS 16949 or QS-9000 - Quality System Requirements:IS
7、O/TS 16949 或QS-9000質(zhì)量體系要求:All suppliers to General Motors must be certified to ISO/TS 16949 or QS-9000 and have a current certificate available demonstrating compliance to GM supplements. All suppliers should migrate to ISO/TS 16949 at the expiration of their current QS9000 certificate but before De
8、cember 4, 2006.GM的所有供應(yīng)商必須通過ISO/TS 16949 或QS-9000標準的認證,并且取得相應(yīng)證書。在現(xiàn)行的QS9000證書 2006年12月到期之前,所有供應(yīng)商應(yīng)該通過ISO/TS16949認證。Suppliers not certified to ISO/TS 16949 or QS-9000, or those suppliers constructing or purchasing facilities to manufacture the parts being quoted, must include an outline of their certifi
9、cation attainment plan with their quote for further consideration.供應(yīng)商如果沒有通過ISO/TS 16949 或 QS-9000認證,或者這些供應(yīng)商需新建或采購設(shè)備來制造報價的零件,供應(yīng)商在報價時必須包括通過認證的計劃。并且必須通過PSAQSA3. General Motors Procedures and Reference Documents:通用汽車的程序和參考文件:Suppliers are to adhere to the requirements contained in the following document
10、s: 供應(yīng)商必須遵守以下文件中所列的要求: -供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊SGMREGION / DIVISION地區(qū)/公司PROCEDURE 程序GMNA北美GME歐洲GMAP亞太LAAM拉美SPO其它Advanced Product Quality Planning & Control PlanReference Manual (AIAG 質(zhì)量先期策劃和控制計劃參考手冊(AIAGX X X X XPotential Failure Mode and Effects Analysis (FMEAReference Manual (AIAG 潛在失效模式和影響分析(FMEA參考手冊(A
11、IAGX X X X XFundamental Statistical Process Control (SPCReference Manual (AIAG 統(tǒng)計過程控制參考手冊(SPCX X X X XMeasurement Systems Analysis (MSA ReferenceManual (AIAG測量系統(tǒng)分析(MSA參考手冊(AIAGX X X X XProduction Part Approval Process (PPAP Manual(AIAG生產(chǎn)件批準手冊(AIAGX X X X XKey Characteristics Designation System (KCDS
12、 GM-1805QN關(guān)鍵特性指示系統(tǒng)(KCDS GM-1805QNX X X X XITEZ1401H KCDS Manual for ITDC ApplicationITEZ1401H ITDC應(yīng)用KCDS手冊O(shè)PELGP-5 Supplier Quality Processes and MeasurementsProcedure. GM-1746 GP-5 供應(yīng)商質(zhì)量過程和測量程序 GM-1746X X X X XGP-8 Continuous Improvement Procedure. GM-1747GP-8 持續(xù)改進程序 GM-1747X X X X XGP-9 Run Rate.
13、GM-1960GP-9 按節(jié)拍生產(chǎn) GM-1960X X X X XGP-10 Evaluation and Accreditation of Supplier TestFacilities. GM-1796 GP-10 供應(yīng)商檢測設(shè)備的評價和鑒定 GM-1796X X X XGP-11 General Procedure for Pre-Prototype andPrototype Material. GM-1820GP-11 Pre-Prototype和Prototype物料綜合程序 GM-1820X SAAB X X XGM Opel GP11 HandbookGM 歐寶 GP11手冊O(shè)
14、PELGP-12 Early Production Containment. GM-1920GP-12 早期生產(chǎn)遏制GM-1920X X X X XTraceability Identifier Requirement TIR-15-300. GM-1731追溯性標識的要求 TIR-15-300. GM-1731X X XSupplier Quality Weld Support Manual供應(yīng)商焊接質(zhì)量支持手冊X X XFixture Standards Requirement GM-1925檢具要求標準GM-1925X X X X X P.E.D.114 X X Principles o
15、f Gage Provisions to Suppliers供應(yīng)商檢具準備原則OPELGM Global Advanced Product Quality Planning (APQP X X X X X -供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊SGMREGION / DIVISION地區(qū)/公司PROCEDURE 程序GMNA北美GME歐洲GMAP亞太LAAM拉美SPO其它Manual GM-1927 GM全球質(zhì)量先期策劃手冊GM-1927GP-4 Pre-Production /Pilot Material ShippingProcedure. GM-1407GP-4 預(yù)試生產(chǎn)/試生產(chǎn)物料發(fā)運程序 G
16、M-1407X XASQ&R Guideline for Project Start-up項目啟動ASQ&R指南OPELEMM1000/1001 X Shipping and Delivery Performance Requirements Ship Direct發(fā)運和運輸要求-直接發(fā)運XPackaging and Labeling Requirements AC Delco andAccessories包裝和標簽要求-AC Delco和附件X4. Quality Planning Requirements: 質(zhì)量策劃要求:APQP: Suppliers must use a
17、n advanced product quality planning process that follows the GM APQP Project Plan (GM1927-1 that ensures production readiness with parts that meet 100% of the products specifications.APQP:供應(yīng)商必須使用與GM APQP項目計劃(GM1927-1相一致的產(chǎn)品質(zhì)量先期策劃流程以確保生產(chǎn)準備就緒的零件100%滿足產(chǎn)品規(guī)范。Operator Training: Training plan must address n
18、ew operators and current operators performing new functions. Training status should be displayed in the area of the manufacturing process.員工培訓(xùn):培訓(xùn)計劃必須強調(diào)對新進員工和轉(zhuǎn)崗員工的培訓(xùn),培訓(xùn)狀態(tài)應(yīng)該在制造區(qū)域展示出來。明確各崗位的上崗要求以及上崗所需要的培訓(xùn)時間Error Proofing: Suppliers shall implement error proofing strategies for the control of materials,
19、 processes and labeling for all products provided to GM. Supplier shall implement error proofing techniques to ensure that mistakes are detected and corrected before becoming a defect (i.e. make it impossible to produce defective items even if an error occurs. The supplier must error proof to a leve
20、l where it is not possible to ship defective products to GM.防錯:供應(yīng)商應(yīng)該執(zhí)行防錯策略以確保所有提供給GM產(chǎn)品的材料,過程和標簽處于受控狀態(tài)。供應(yīng)商應(yīng)該運用防錯技術(shù)以確保產(chǎn)生缺陷之前及時發(fā)現(xiàn)缺陷并采取糾正措施(例如:采用“不可制造”的防錯技術(shù)。供應(yīng)商的防錯必須達到一定的水平,以防止缺陷零件發(fā)送到GM。Traceability: A Traceability scheme shall be developed in accordance with regional and divisional requirements. Tracea
21、bility scheme may include manufacturing date code and lot control. Items to be traced shall be determined in during the APQP process.可追溯性:可追溯性計劃應(yīng)該根據(jù)不同地區(qū)的要求來開發(fā).可追溯性計劃可以包括制造日期編碼和批號控制??勺匪菪皂椖繎?yīng)該在APQP過程中確定。Verification of Customer Used Features: Customer-used part features (examples: fit, form, function,
22、mating surfaces, etc. shall be incorporated in the PFMEA, process control plan, layered audits, and error/mistake proofing. Additional items to be checked shall be defined during the APQP process. These features should be verified at a frequency of 100%.顧客使用特性的驗證:顧客使用特性:(例如:配合,形狀,功能,匹配面等應(yīng)該包括在PFMEA,過
23、程控制計劃,分層審核和防錯中。附加項目的檢查應(yīng)該在APQP過程中詳細說明。這些特性應(yīng)該100%加以驗證。Inspection Fixtures and Gages Requirements:檢具要求: -供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊SGMSupplier to assume the gage construction orientates the part in vehicle position unless Supplier Quality approves a deviation.除非SQE批準此項偏差,供應(yīng)商應(yīng)根據(jù)零件的裝車位置來制造檢具。All customer monitored A
24、PQP parts shall have gage designs approved by the Supplier Quality Engineer or the appropriate customer gage approval group prior to the start of fixture construction (for your regional requirements, contact your supplier quality engineer. Gage designs shall incorporate approved GD&T datum schem
25、es and gages/fixtures must be capable to dimensionally evaluate parts.所有顧客監(jiān)控的APQP 零件,應(yīng)該由SQE或合適的顧客檢具認可小組在檢具制造開始之前(與SQE聯(lián)系所在地區(qū)要求對檢具設(shè)計進行認可。檢具設(shè)計應(yīng)該包括認可的GD&T基準方案以及檢具必須具備評價零件尺寸的能力。Supplier shall have hand apply fixtures for sub-datum KPCs and openings where assembly plant or sequencer/subassembler will
26、install something that impacts a final vehicle specification (e.g. trim plates, extension panel, grilles, glove box door, etc.在零件的次基準KPC和主機廠/排序/分供方需要安裝影響車輛終檢的零件接口處,供應(yīng)商應(yīng)配備檢測次基準KPC項目和接口的手動檢具(例如:內(nèi)飾板,延伸板,格柵,手套箱門等。Supplier shall have the ability to check a completed assembly. Sub-contractors shall also h
27、ave the ability to check component parts. Any cubing or build fixture shall have the ability to demonstrate fit to adjoining parts and attachments.供應(yīng)商應(yīng)該具備檢測整個總成的能力。分供方也應(yīng)該具備檢測分零件的能力。任何檢具應(yīng)該具備檢測與其他零件是否相匹配的功能。Appropriate functional testing and final inspection to ensure product performs as designed unde
28、r actual vehicle conditions.使用適當?shù)墓δ軝z測和最終檢測以確保產(chǎn)品在實際的車輛狀態(tài)下符合設(shè)計要求。Supplier shall ensure that fixtures are procured in a timely manner to meet major program benchmarks (i.e. first shots, GP-11 events, Functional evaluations, and PPAP. Supplier shall, at a minimum, have a CMM (coordinate measurement mach
29、ine holding fixture available for the inspection of first parts off prototype and production tooling.供應(yīng)商應(yīng)該確保及時完成檢具來滿足主要項目的節(jié)點要求(例如:投入使用,GP-11,功能評估和PPAP。供應(yīng)商應(yīng)該至少使用CMM(三坐標測量機和零件專用夾具,用其檢測樣件工裝和生產(chǎn)工裝制造的首件。5. Quality Control Requirements:質(zhì)量控制要求:Layered Audits: A documented layered audit plan shall exist with
30、 a minimum frequency of once per shift. Non-conformities shall be addressed immediately and corrective action shall be documented. Audit plan shall include multiple levels of management. Site leadership shall verify compliance to the documented plan.分層審核:必須具備文件化的分層審核計劃,審核的頻次至少應(yīng)該每班一次。應(yīng)該立即記錄不符合項并且將糾正措
31、施文件化。審核計劃應(yīng)該覆蓋管理的各個層次。領(lǐng)導(dǎo)層應(yīng)該驗證計劃的完成情況。Containment: All non-conforming and suspect material must be controlled. Method must be clearly defined. Visual controls should be implemented. All non-conforming material must be segregated and identified. GP12 and shall be implemented during launch. Upon request
32、 of GM additional levels of proactive containment may be required. Should a problem occur, suppliers are required to implement effective and immediate spill containment and comply fully with GP-5 requirements and the controlled shipping that may result.遏制:所有不合格和可疑材料必須被控制。必須清楚地定義其方法。應(yīng)該執(zhí)行目視控制。所有不合格材料必
33、須被隔離和標識。在”Launch”階段包括試生產(chǎn)和正式生產(chǎn)開始后初級階段GP12應(yīng)該被執(zhí)行。按照GM的要求附加的遏制措施可能被要求執(zhí)行。如果問題發(fā)生,應(yīng)要求供應(yīng)商立即采取有效的遏制措施,并完全遵守GP-5的要求以及可能導(dǎo)致的控制發(fā)運。Quality Performance Metrics: Each Suppliers Senior Management shall commit to maintain and continuously improve quality. GQTS (Global Quality Tracking System monitors performance data
34、 for PPM, PRRs, Controlled Shipping Level I and II, Major Assembly Plant Disruptions, and QS-9000, -供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊SGMISO/TS16949 and ISO14001 Certifications. Suppliers shall monitor their quality performance, on-line, through GQTS.質(zhì)量表現(xiàn):每一家供應(yīng)商的高級管理層應(yīng)該承諾保持質(zhì)量的持續(xù)改進。GQTS(全球質(zhì)量跟蹤系統(tǒng)監(jiān)控供應(yīng)商的PPM, PR/Rs,一級和二級控制發(fā)
35、運,主機廠停線記錄,QS9000, ISO/TS16949 和ISO14001的認證等數(shù)據(jù)。如可能,供應(yīng)商應(yīng)通過GQTS在線監(jiān)控其質(zhì)量表現(xiàn)。Production Quality:生產(chǎn)質(zhì)量:All suppliers are required to have effective manufacturing practices and procedures to ensure a continuous flow of defect free parts into GM production facilities.應(yīng)要求所有的供應(yīng)商具備有效的制造流程以確保無缺陷的零件連續(xù)地運送到GM生產(chǎn)線上。Cur
36、rent Product Improvement Process (CPIP: Suppliers shall actively participate in the timely resolution of problems identified by GMs CPIP. Suppliers shall provide appropriate corrective action documentation and project status updates as requested.產(chǎn)品改進過程(CPIP:供應(yīng)商應(yīng)該積極解決GM的CPIP識別的問題。供應(yīng)商應(yīng)該按要求提供適當?shù)募m正措施及項目
37、狀態(tài)更新。6. Advance Problem Solving Requirements:先期問題解決要求:Suppliers are required to demonstrate their capability to solve complex problems using advanced problem solving techniques such as the “Red X” system at GM.供應(yīng)商應(yīng)證明其具備運用先期問題解決技術(shù)(例如GM“Red X”系統(tǒng)來解決復(fù)雜問題的能力。7. Production Support Requirements:生產(chǎn)支持要求:On-S
38、ite support during pre-production and launch: Upon request of SQ or GM Plant, Supplier will provide on-site support during all pre-production build phases and production launch activities. 在試生產(chǎn)和生產(chǎn)階段的現(xiàn)場支持:根據(jù)SQ或GM工廠的要求,在整個試生產(chǎn)和生產(chǎn)”Launch”階段,供應(yīng)商應(yīng)該提供現(xiàn)場支持。Supplier contacts for all shifts: Supplier shall de
39、signate a specific supplier representative that will support each of the GM Plants shifts. At a minimum the supplier designate should have the responsibility to:供應(yīng)商與GM生產(chǎn)各班保持聯(lián)系:供應(yīng)商應(yīng)該指派明確的代表來支持GM工廠的每一班生產(chǎn)。供應(yīng)商指派的代表應(yīng)至少負責以下方面:Implement immediate countermeasure to contain discrepant parts and to confirm th
40、at defective parts are not shipped to GM Plant.對缺陷零件立即采取措施以確保缺陷零件不會發(fā)送到GM工廠。Approve GM Plants/SQEs requests for rework and sort.按照GM 工廠/SQE 的要求返工和篩選。Coordinate and provide resources to rework and sort parts.協(xié)調(diào)提供返工和篩選零件所需的必要資源。Provide sub-assemblies / components for required repair, related to quality
41、 issues.提供分總成/零件相關(guān)質(zhì)量問題所要求的返修。Provide clear information regarding any defective parts in-route to GM Plant (how to identify defect, disposition guidelines.提供正在運往GM工廠途中,有關(guān)缺陷零件的明確信息(如何識別缺陷,處置方針。Coordinate special delivery of certified OK parts.協(xié)調(diào)合格零件的特殊運輸。Quality data: Supplier must provide quality-rel
42、ated data (e.g. historic inspection, first time quality, reject data to GM upon request. This data may be required to determine trends and to root cause quality problems at the GM Manufacturing or Assembly Plant. -供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊SGM質(zhì)量數(shù)據(jù):如GM有要求供應(yīng)商必須提供相關(guān)的質(zhì)量數(shù)據(jù)(例如歷史檢驗數(shù)據(jù),一次合格率,廢品率 給GM所要求的部門。這些數(shù)據(jù)可能在GM制造廠或總
43、裝廠在確定質(zhì)量問題的趨勢和根本原因時需要用到。8. Tier 1 Responsibilities (including suppliers of complex systems/sub-assemblies:供應(yīng)商職責(包括復(fù)雜系統(tǒng)/分總成的供應(yīng)商:The tier one supplier is responsible for implementing and adhering to AIAG and GM requirements (see section 3 for all components of the assembly including directed buy parts
44、unless otherwise specified by the procuring division. GM may, at their discretion, assign an SQE to work with the tier ones SQE for the purposes of learning, inputting, and concurring on component related issues.除非采購部另有規(guī)定,供應(yīng)商負責對所有的裝配零件包括直接采購的零件堅持執(zhí)行AIAG and GM-9000的要求(參見第三章節(jié)。GM可以自行決定指派一名SQE與供應(yīng)商的SQE共同
45、研究,輸入和商討零件的相關(guān)問題。Note:All tier one suppliers is responsible for the sub-contractors management/or the product quality of sub-contractors.注:所有一級供應(yīng)商必須對分供方的管理/或分供方的產(chǎn)品質(zhì)量負責。9. Powertrain Suppliers:動力總成供應(yīng)商: Powertrain suppliers must adhere to the Supplier Quality Statement of Requirements Powertrain Addend
46、um動力總成供應(yīng)商必須執(zhí)行“動力總成供應(yīng)商質(zhì)量聲明附錄”的要求10.Systems and Procedures Access:獲取體系和程序文件:Suppliers shall have internet access to effectively communicate with General Motors. GM Supplier Quality procedures and systems can be accessed through the GM SupplyPower web page (.供應(yīng)商應(yīng)該通過網(wǎng)絡(luò)與GM進行有效的聯(lián)系??赏ㄟ^GM的SupplyPower 網(wǎng)址來獲取G
47、M 的供應(yīng)商質(zhì)量程序和體系文件(。All GM specific procedures and documents listed can also be obtained by contacting Boise Cascade Office Products at 1-888-216-0371, Fax 1-888-216-0603.所有GM特殊的程序和文件可通過聯(lián)系Boise Cascade辦公室來獲取,電話:1-888-216-0371,傳真:1-888-216-0603。Automotive Industry Action Group (AIAG documents can be obt
48、ained by contacting AIAG at 01-248-358-3003. Documents can also be ordered at . To obtain these documents in Europe, contact Carwin Ltd. at 44-1708-861333. In Brazil, contact IQA at 5511-5533-4545 or .br. "AIAG的文件可通過AIAG 的電話 01-248-358-3003來訂購,也可以通過網(wǎng)絡(luò)來訂購。如要獲取歐
49、洲地區(qū)的文件,請與Carwin 公司聯(lián)系,電話:44-1708-861333. 如要獲取巴西地區(qū)的文件,請與 IQA公司聯(lián)系,電話: 5511-5533-4545 或網(wǎng)址.br。 SGM-供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊Supplier Quality Statement of RequirementsPowertrain Addendum供應(yīng)商質(zhì)量聲明動力總成附錄1. Performance Requirements:能力要求:For Key Product Characteristics (KPCsGM1805QN and Product Quality Characte
50、ristics (PQCs: 關(guān)鍵產(chǎn)品特性(KPCs-GM1805QM和產(chǎn)品質(zhì)量特性(PQCs:Minimum SHORT TERM Process Capability at PPAP (P p of 2.0 and (P pk of 1.67.PPAP中的短期過程能力(P p至少達成2.0和(P pk至少達到1.67。Minimum LONG TERM Process Capability (C p of 2.0 and (C pk of 1.5.長期過程能力(C p至少達成2.0和(C pk至少達到1.5。For Standard Characteristics (listed on C
51、ontrol Plan or job instructions and approved by customer: 標準特性(已經(jīng)列入控制計劃和工作指導(dǎo)書,并被顧客認可:Minimum SHORT TERM Process Capability (P pk of 1.33 to be demonstrated upon request.短期過程能力(P pk至少達到1.33以上。Minimum LONG TERM Process Capability (C pk of 1.0 to be demonstrated upon request.長期過程能力(C pk至少達成1.0。If durin
52、g Product / Process development you believe there will be difficulty meeting the above capability, you MUST immediately notify your Supplier Quality Engineer (SQE and develop a plan to assure compliance and/or obtain formal written approval to deviate from the capability requirements.如果在產(chǎn)品/過程開發(fā)中,達到上
53、述要求的能力有困難,供應(yīng)商必須立即通知SQE并且制定計劃來確保達到要求,否則應(yīng)得到正式書面的能力偏差許可批準.2. Process Failure Mode and Effects Analysis (PFMEA:過程FMEA:As a general rule, RPNs should be 40 or below. Processes showing RPNs over 40 must obtain formal written approval from your GM SQE.作為一個總體原則,RPNs應(yīng)該在40以下. 過程中RPNs 如果超過40 需要得到GM SQE的正式書面的批準
54、。GM Powertrain PFMEA ranking charts (reference APQP manual GM1927-28 shall be used.GM動力總成的PFMEA應(yīng)該使用排列圖(參考APQP手冊GM1927-28。3. Cleanliness Requirements:清潔度要求:Part and process cleanliness shall be considered during the development of the PFMEA. Appropriate actions shall be taken during the APQP process
55、as driven by the PFMEA RPNs.PFMEA開發(fā)過程中應(yīng)該考慮零件和過程中的清潔度。根據(jù)PFMEA的RPN,在APQP過程中采取適宜的措施來保證清潔度。 SGM-供應(yīng)商質(zhì)量、項目經(jīng)理必備手冊二、 A PQP要求1.SGM要求供應(yīng)商按照GM1927 Global APQP(2002.10第二版和AIAG APQP的要求,對所有新開發(fā)零件進行先期質(zhì)量策劃活動。對EWO零件和其他需要進行PPAP的零件,參照執(zhí)行適用的部分(具體要求與SQE確定。2.按GM TS16949顧客特殊要求,APQP記錄應(yīng)保存至產(chǎn)品(或產(chǎn)品組供貨期間加一個日歷年,除非SGM書面同意放棄。3.按TS169
56、49要求,供應(yīng)商應(yīng)對二級供應(yīng)商按照ISO9000:2000進行質(zhì)量體系開發(fā)工作。對二級供應(yīng)商的零件應(yīng)進行APQP和PPAP、GP9、GP12等活動。對模塊化供貨或系統(tǒng)供貨的供應(yīng)商,要求其對適用的二級供應(yīng)商根據(jù)GM Global APQP(GM1927和AIAG APQP進行產(chǎn)品質(zhì)量的先期策劃。4.供應(yīng)商必須按GM Global APQP進行要求的4次可行性承諾和項目評審,完成規(guī)定的17項任務(wù)。問題清單和項目進度表應(yīng)保持動態(tài)更新,與項目狀態(tài)一致。其中啟動會議要求見附件一。5.FE、OTS、Prototype等樣件的提交,需按SGM有關(guān)規(guī)定嚴格執(zhí)行(如保證書、零件偏差標注、試驗記錄、全尺寸報告、能
57、力分析、工裝要求等。6.試驗項目必須由GP10認可的試驗室進行。7.檢具必須按SGM的要求(如GM1925完成,并按規(guī)定的時間節(jié)點,由SGM的檢具工程師進行檢具概念認可、設(shè)計認可和制造認可。8.制造流程圖與過程一致并且包括所有接收、存儲、生產(chǎn)、檢驗、返工、包裝和標簽作業(yè)以及發(fā)運。流程圖與PFMEA、控制計劃一致??刂朴媱澩晟啤⒂行?。9.APQP過程中對任何可能影響項目進度或產(chǎn)品質(zhì)量的問題,都必須在問題清單中記錄,及時通知SQE,并積極跟蹤解決。10.在項目開發(fā)初期、SGM生產(chǎn)啟動前等項目過程中,SGM將對供應(yīng)商進行風險評估,并對高風險的供應(yīng)商采取額外的控制措施(如專門的質(zhì)量閥會議。11.在SGM生產(chǎn)啟動前,SGM要求各有關(guān)供應(yīng)商參加SGM召集的生產(chǎn)啟動會議(Launchmeeting。三、 F E 要求1、 一般規(guī)定1.1 零件符合最新工程更改狀態(tài)。1.2 使用工程批準的材料。1.3 檢具定位基準的位置及尺寸必須符合圖紙要求。1.4 供應(yīng)商必須完成測量計劃。測量計劃必須包括KPC/PMP及產(chǎn)品特性和工藝要求
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 護理教學(xué)文獻核心要點解析
- 轉(zhuǎn)讓美團店鋪協(xié)議書
- 食堂合作使用協(xié)議書
- 買賣二手機合同協(xié)議書
- 車險事故雙方協(xié)議書
- 做生意租賃合同協(xié)議書
- 鎮(zhèn)區(qū)保潔垃圾協(xié)議書
- 項目出資合同協(xié)議書
- 門窗經(jīng)銷合伙協(xié)議書
- 鋼琴老師合伙協(xié)議書
- 2025-2030中國個人征信行業(yè)發(fā)展現(xiàn)狀調(diào)研及前景預(yù)測分析研究報告
- 2025農(nóng)業(yè)銀行筆試題庫及答案
- CNG場站應(yīng)急處置方案
- 民宿裝修合同協(xié)議書
- 地第十一章《極地地區(qū)》教學(xué)設(shè)計-2024-2025學(xué)年七年級地理下冊(人教版2024)
- 《新能源汽車電氣系統(tǒng)》教學(xué)設(shè)計 任務(wù)1 新能源汽車充電系統(tǒng)認知
- 河南省青桐鳴大聯(lián)考普通高中2024-2025學(xué)年高三考前適應(yīng)性考試語文試題及答案
- 2025年BIM技術(shù)在工程項目風險管理中的應(yīng)用研究報告
- 山東省煙臺市、德州市、東營市三市東營2025年高考適應(yīng)性考試煙臺德州東營二模英語試卷+答案
- 2025年共青團入團考試測試題庫及答案
- 2025年上海市16區(qū)初三語文一模試題匯編之古詩文閱讀(學(xué)生版)
評論
0/150
提交評論