修建性詳細規(guī)劃成果內(nèi)容及深度要求英文版!!_第1頁
修建性詳細規(guī)劃成果內(nèi)容及深度要求英文版!!_第2頁
修建性詳細規(guī)劃成果內(nèi)容及深度要求英文版!!_第3頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)

文檔簡介

1、the contents and depth requirements of detailed construction plana) location information1 location:site in the master plan of city2 surroundings:including land use ,planning and basic situation of the surroundingsb) current situation of the site1 land use & coverage of the site(1:500):need to show t

2、he situation of land use and coverage of the site and surroundings, including existing buildings, water body, trees and so on;2 existing resource analysis: including natural landscape resource, humane landscape resource, transportation resource and so on, the specific items of which is optional depe

3、nding on the site itself.c) planning conditionstexts show the planning conditions provided by planning department, use one attachment for the copy of planning conditions.d) planning land propertyshow the requirement of different land properties, covering area, set-back line of site, attached by land

4、 balance table.e) master plan1 master plan (color)vividly show the layout of buildings, roads, green land, water body and other facilities.2 master plan (black & white)accurately reflect the layout of buildings, roads, green land, water body and other facilities. including: the coordinates of the tu

5、rning point of boundary of construction land and adjacent terrain; function of the buildings, serial numbers, base area, floors, building interval, set-back line of buildings; the coordinates of the roads, elevation, and the width of boundary lines of roads orientation, width, entrance & exit of the

6、 roads in the site, the space and numbers of underground& surface parking and the arrangement of turn-round space.f) main technological and economic indicatorsincluding site area, total floor area, total underground area, building density, far, greening rate, public green area, per capita public gre

7、en area, the total number of surface parking, the total number of underground parking, population, the total number of households, residential floor area, residential density, net residential density and so on.g) planning of road and traffic1 planning of road and trafficroads width, slope, the coord

8、inates of the controlling points, elevation, turn radius, cross-section of roads, width, coordinates of the excess and harrier-free design.2 parking layoutunderground and surface parking space and total numbers of each, parking mode and the arrangement of turn-round space.h) planning of green spaces

9、 systemthe connection and arrangement of public green, specified green space, green belts around houses and street green area . important green space requires landscape design and plant configuration.i) the public service facilities planningthe function, location and boundary of supporting service f

10、acilities.j) infrastructure planningthe location and boundary of supporting infrastructure, such as electricity distribution, gas station and dump area.k) vertical planbalance calculation of earthwork, ensure the coordinates of the controlling points and buildings, surface drainage way , the locatio

11、n of flood intercepting trench, the form & elevation of retaining wall, the surface drainage direction and slope.l) comprehensive pipeline planningincluding water supply lines, sewer lines, power line, telecommunication pipeline, cable line, gas line and the location, pipe diameter, depth of the out

12、door fire hydrant. also including load prediction, existing pipelines situation, ground elevation, sewer lines elevation, different pipelines rout & location & pipe diameter, and should acquire the preliminary examination opinions of relevant departments.m) construction sequenceincluding constructio

13、n cycle, annual construction plan arrangements, time and phases of establishment of municipal administration infrastructure and public service facilitiesn) sunshine analysis report and traffic impact evaluationo) building typology, the plan, faade and section of buildingsp) renderings of viewsinclud

14、ing aerial view or models of the whole planning, perspective rendering of focal area and interface, specific requirements are as follows: aerial view should include daytime and nightscape presentation; perspective rendering of focal area and interface should choose people visual angle from the arter

15、ial roads;special area should take real sight of landmark into consideration; show the location of building advertisements and shop signs and the material of external buildingsq) drawing contents i. locationii. surroundingsiii. land use(black&white,1:500)iv. planning conditionsv. planning land prope

16、rty(1:500)vi. master plan (color,1:500)vii. master plan (black & white,1:500)viii. main technological and economic indicatorsix. planning of road and trafficx. parking layoutxi. planning of green spaces systemxii. the public service facilities planningxiii. infrastructure planningxiv. vertical planxv. comprehensive pipeline planningxvi.

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論