1、MANE China New Factory Project曼氏(中國)香精香料新建廠房工程General Contractor Package總包投標文件ationMEP Specifications機電技術要求MEP-SPEC-07TESTING AND COMMISFIRE SERVIING消 防 設 施 的 測 試 和 調 試說 明:曼氏(中國)香精香料Package Owner: MANE (China) FRAGRANCE AND FLAVOUR CO.,.版次:0 Revi: 0編制日期:2017 年 01 月 20 日Preparation Date: Jan. 20th 20
2、17項目名稱:曼氏(中國)香精香料Project: MANE China New Factory Project新建廠房工程Table of Contents 目 錄11.11.2Testing Procedures 測 試 程 序General 概 述Visual Inspection 目測22.12.22.32.4Electrical Systems 電 氣 系 統(tǒng)Auto Fire detection System 自 動 火 警 探 測 系 統(tǒng)Activated devi激活設備Audio & Visual Alarm devi聲光Emergency warning system 緊
3、急設施系 統(tǒng)33.1Hydraulic system 水力 系 統(tǒng)Pi管 道1.0Testing Procedures 測試程序1.1General 概述Supply apparatus and materials nesary for, and carry out the commising, and testsspecified herein, or required by the Fire Inspectors, Supervi presence of the Project Managers represenive.unit, and Fire Bureau,he應提供進行調試和測試所
4、需的設備和材料,這里所指的測試是指應消所要求的,并在項目經(jīng)理的代表參與下所進行的。查員、監(jiān)理和消防局等All tests should be carried out in a manual mode of operation as well as simulating an automatic emergency condition.所有的測試都為手工操作,并模擬自動緊急情況。Tests listed here are a minimum requirement and the contractor shall perform all ne testing and inspections to
5、 the satisfaction of the Project Manager and Authorities.sary這里列出的測試均為最低要求 ,承包商必須按項目經(jīng)理和當?shù)卦嚭蜋z查。部門要求進行所有必要的測1.2Visual Inspection 目測A detailed inspection shall precede testing and should be carried out with the section of the Works under inspection disconnected from the supply.在測試之前要進行仔細的檢查,檢查進行時測試區(qū)域應斷
6、電。The detailed inspection shall confirmt the Works have been installed in accordance with thedesign and include, but not be limited to, verificationt:應進行仔細的檢查以確保安裝與設計相一致,并至少應確認:Equipment comp s with the specified standards, has been properly selected and erectedand is not visibly damaged or defectiv
7、e so as to impair safety, and has been provided.t adequate acs設備符合規(guī)范,其選型合理,安裝正確,且沒有會會影響安全操作的明顯的損壞,并且便于維修。Appropriate isolating and switching devihave been provided andt protective andmonitoring devihave been appropriay chosen and set.應安裝合適的絕緣和開關設備,并且已經(jīng)選擇和設置了合適的保護和設備。Identification labeling has been
8、properly provided for circuits, switches, fuses andterminals, andt operating diagrams and instructions, together with danger and warningnoti, are in place.應在電路,開關,保險絲和接線端已經(jīng)貼上可識別的,并設有操作說明和警告。Pipework has been paed to the requirement of the specification.管道已按說明的要求油漆好。Penetrations through fire walls ha
9、ve been sealed in an approved manner.應對中縫隙按認可的方式填充。2.0Electrical systems 電氣系統(tǒng)21.Automatic Fire Detection System 自動火警探測系統(tǒng)Ensure fire detection equipment comp s with clearance measurements from air outlet grilles and the like.應確?;馂臋z測設備與風口保持一定的測量間距。Each component group,should be separay functionally te
10、sted. Each function check shouldbe carried ouleast twice.每個組件均需單獨進行功能測試。每次功能測測試至少進行兩次。Function checks should include, but not be limited to, for verification功 能 測 試至少應包括以下內容:t:erlocking and overriding deviensuret the overall sequence of control is achieved.應提供連鎖和過載設備以確保整個控制按序進行。Equipment protection
11、devi設備保護設施運行良好operate satisfactorily.Deviactivated by fire alarm operate satisfactorily.與火警裝置聯(lián)動的設備運做良好Safety is not jeopardised突然斷電時不危及安全he event of theerruption of the electrical supply.Smoke detectors shall be tested using an approved smoke source. Activating the sensor to ensure both the red indi
12、cating light is illuminated (on the sensor) and the alarm haivated the FAP使用認可的煙源檢測感煙探測器。激活探測器以確保探測器上的紅色指示燈點亮,并且激活火災盤。Heat detectors shall be tested using an approved heat source. Activating the sensor to ensureboth the red indicating light is illuminated (on the sensor) and the alarm haivated the F
13、AP使用認可的熱源檢測溫煙探測器。激活探測器以確保探測器上的紅色指示燈點亮,并且激活火災盤。Carryoommising tests to the requirement of the functional Specifications and drawings.按設計說明和圖紙的要求進行調試。Every function of the FAP shall be tested and verified in accordance with the approved design and performance criteria.火災盤的每項功能都均測試和校準, 且應與過的設計技性能參數(shù)相一致。
14、2.2Activated devi激活設備Test the functional operation of: 測試下列設備的功能Fire doors 防火門Smoke and fire ders. 排煙防火閥HVAC equipment 暖通設備Electricalerlocking devi電氣連鎖設施2.3Audio & Visual Alarm devi聲光設施Test the functional operation of: 測試下列設備的功能Audio alarms, i.e. Bells, sirens 聲音, 如: 警鈴,器Visual system, i.e. strobes,
15、 flashing lights 光系統(tǒng), 如:閃光燈2.4Emergency Warning Systems 緊急系統(tǒng)Carryoommising tests to the requirement of this 9+Specification.應按此說明的要求進行調試。Check the functioning of the PACP.檢查公共廣播控制盤的功能。3.03.1Hydraulic systems 水力系統(tǒng)Pi管道Hydrosic Tests 水壓測試Maain a test prere of 1.5 times theum sic working prere forriod of 24hours orif nesary to complete the inspection of pipework under test.管道測試壓力為最大工作壓力的 1.5 倍,并保持 24 小時或以上(如果需要的話)。W
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 大學物理知識復習的系統(tǒng)思考試題及答案
- 洗衣房工作崗位職責(7篇)
- 車間安全生產(chǎn)合同書
- 2025防臺防汛安全的工作總結(9篇)
- 金融科技對普惠金融發(fā)展影響2025年行業(yè)案例分析報告
- 農(nóng)產(chǎn)品電商用戶忠誠度研究試題及答案
- 貨物代理中介合同
- 家具產(chǎn)業(yè)改革對設計人才的要求分析試題及答案
- 學生防艾知識試題及答案
- 學習委員面試題及答案
- T-COFA 0021-2022 漁用油電混合多旋翼無人機安全檢查和維 護保養(yǎng)要求
- 2025屆河北省“五個一”名校聯(lián)盟高三下學期4月聯(lián)考化學試題(含答案)
- 山東省泰安市2025屆高三二輪模擬檢測考試政治(泰安二模)(含答案)
- GB/T 31928-2015船舶用不銹鋼無縫鋼管
- GB/T 28046.4-2011道路車輛電氣及電子設備的環(huán)境條件和試驗第4部分:氣候負荷
- 中藥學-七版教材
- 配位化學-配合物結構的表征和測試研究課件
- 《文物保護技術概論》課件 8.第七章 壁畫保護
- 電力排管檢驗批
- 深度學習人工智能在醫(yī)療圖像處理中的應用課件
- 自動涂膠機機械系統(tǒng)設計和實現(xiàn) 機械制造自動化專業(yè)
評論
0/150
提交評論