




全文預覽已結(jié)束
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
The Software Process 1. During which phase of the software project management life cycle should testing occur? A. integration B. validation C. implementation D. maintenance E. testing occurs during each phase. 2. Why should each phase be fully documented before the next phase begins? A. The pressures to deliver the product on time are such that postponed documentation may never be delivered. B. The individual responsible for an early phase may not be available by the time that the documentation needs to be produced. C. A product is constantly changing during development. Until the changes are documented, modifications will be difficult to achieve. D. The question is incorrect. Documentation should be left under the product is finalised and is a specialised subject best left to expert technical writers. E. Postponed documentation may never be delivered, the individual responsible may have left later in the project and the fact that the product is constantly changing are all reasons why each phase should be fully documented before the next phase begins. 3. At which stage of the products life cycle should documentation be produced? A. testing, as it is only here that the technical writers can see what has been built and document it. B. maintenance, as this is the first phase when it is required in order to fix faults or make enhancements. C. specification, as it is needed to produce test cases for acceptance testing. D. at no stage, the use of modern techniques such as extreme testing obviates the need for any documentation E. throughout the project F. documentation phase 4. The individual or organisation who wants a product to be developed is known as the: A. developer B. user C. contractor D. initiator E. client 5. The members of the organisation responsible for building that product are known as the: A. developers B. users C. contractors D. initiators E. clients 6. One method of getting around the problem of the developers and clients visualising a piece of software and its functionality is to build a rapid prototype. What may be omitted from the prototype? A. its user interface B. requirements details C. functionality D. any of these may be omitted from the prototype E. file updating or error handling 7. The name of the organisation responsible for ensuring that the product delivered is what the client ordered is the: A. development team B. test team C. documentation department D. end-user group E. software quality assurance group 8. Which of the following items should not be included in the software project management plan? A. the techniques and case tools to be used B. detailed schedules, budgets and resource allocations C. the life cycle model to be used D. the organisational structure of the development organisation, project responsibilities, managerial objectives and priorities E. all of these aspects should be included 9. If a specification statement is to be testable then it one of the properties it must have is: A. tenacity B. probity C. longevity D. verifiability E. traceability 10. A fault to look for during testing of the products design is: A. logic fault B. interface fault C. lack of exception handling D. non-conformance to specifications E. all of theses are examples of faults to look for during testing of the products design. 11. Why is it necessary to carry out acceptance testing? A. The test group may not be competent enough. B. To receive the final payment for the completed product. C. Over 50% of the faults are found at the acceptance test phase. D. It is not until this stage of the testing that the system as a whole (hardware and software) is exercised. E. The users may use a combination of functions and data that are not anticipated by the developers. 12. The final form of testing COTS software is _ testing. A. unit B. integration C. alpha D. module E. beta 13. More time and money is spent in the _ phase than any other phase. A. requirements B. specification C. implementation D. integration E. maintenance 14. In the maintenance phase the product must be tested against previous test cases. This is known as _ testing. A. unit B. integration C. regression D. module E. beta 15. According to Brooks No Silver Bullet 1986, which aspect of software production is inherently difficult? A. complexity B. conformity C. changeability D. invisibility E. all of these 16. A major problem with the essence of software is that it is invisible and unvisual (Brooks, 1986). Visualisations such as flowcharts and data flow diagrams are extremely useful and powerful ways of visualising certain aspects of the product. What is the problem with the use of such diagrams?A. There is no standard agreed notation for each of the diagrams. B. Programming is an art and not an engineering science. Thus only an abstract diagram can capture the models semantics and such diagrams are subject to personal interpretation. C. Software is three-dimensional and only a few specialised systems can depict three-dimensional diagrams. D. Visualisations are not an effective means of communicating with clients and other software engineers. E. Such diagrams cannot embody every aspect of the product, nor is there a way of determining what is missing from any one visual representation of the product. 17. According to Brooks (1986) which approach is capable of achieving an order of magnitude improvement in software development p
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 公路設(shè)計項目管理制度
- 機關(guān)食堂人員聘用方案(3篇)
- 消防專業(yè)分包方案(3篇)
- DB62T 4392-2021 集中式飲用水水源地命名和信息編碼規(guī)范
- 煤礦采空區(qū)滅火方案(3篇)
- 藥酒包裝銷售方案(3篇)
- 微商合作合同協(xié)議書
- 房屋代銷合同補充協(xié)議書
- 秸稈清運措施方案(3篇)
- 基礎(chǔ)護理發(fā)熱課件
- 電機檢測報告
- 上市合作合同協(xié)議書范本-IPO
- 邊坡巡檢記錄表完整優(yōu)秀版
- 最新消毒記錄表每日消毒表
- 自發(fā)冠脈夾層診療指南解讀
- 《一滴水經(jīng)過麗江》的課件
- 原子熒光分析(汞)原始記錄2
- 三級醫(yī)院服務(wù)能力指南2022
- 家庭室內(nèi)裝飾裝修工程驗收單
- 物流招標文件模板(完整版)
- 電梯困人救援流程圖
評論
0/150
提交評論