

全文預覽已結束
下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
合同范本/建設工程合同 agreement of bot project this agreement is made and entered into by and between the government of_(hereinafter called b) represented by_(hereinafter called a) and _corporation, a company duly organized and existing under the laws of the peoples republic of china with its principal office at_(hereinafter called c). whereas, a and c concluded the memorandum concerning _project on the _and c had been given exclusive right from b to carry out investigation and implement _project (hereinafter called the project) by way of joint financing between c and b (so called bot). whereas, the loan agreement, guarantee agreement, letter of guarantee, etc. shall constitute integral components of this agreement. the projects installed capacity is _. now therefore, the parties hereby agree as follows: 1. definition and interpretation project means the planning, feasibility study, design and engineering, construction, equipping, completion, testing, commissioning and operation of the infrastructure project. project cost means the cost specified in clause 3. operation period means the period specified in clause 10.1 from the starting date of commercial operation of the infrastructure pletion date means the day upon which c certifies that the infrastructure project has successfully completed its testing and can start operation period. force majeure shall have the meaning specified in clause 16. project scope means the scope of supply and services of c in connection with the execution of the project as described in annex 2. site means the site for the infrastructure project including _, special roads, and other areas for construction as specified in annex 2. transfer date means the day following the last day of the operation period. new company means the company to be established between c and _entity as specified in clause 5. investment agreement means the agreement on mutual encouragement and protection of investment between the government of thepeoplesrepublic of china and the government of the _. exclusive right means the special power granted to c or new company in the memorandum, agreement and its annex. day means the solar calendar day. 2. the project 2.1 the project shall be named as _. 2.2 the infrastructure project is intended to be located at _. the exact locat
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2030中國緊急醫(yī)療服務(EMS)行業(yè)項目調研及市場前景預測評估報告
- 2025至2030中國皮質類固醇反應性皮膚病行業(yè)發(fā)展趨勢分析與未來投資戰(zhàn)略咨詢研究報告
- 2025至2030中國生物解放軍電影行業(yè)發(fā)展趨勢分析與未來投資戰(zhàn)略咨詢研究報告
- 2025至2030中國瓷磚市場經營狀態(tài)與投資趨勢前景分析報告
- 2025至2030中國玩具和嬰童用品市場營銷效益與投資方向建議報告
- 2025至2030中國物理安全信息管理(PSIM)行業(yè)發(fā)展趨勢分析與未來投資戰(zhàn)略咨詢研究報告
- 2025至2030中國牙科植入扳手行業(yè)發(fā)展趨勢分析與未來投資戰(zhàn)略咨詢研究報告
- 安保服務勞務合同范文
- 小學三年級數學幾百幾十加減幾百幾十評價試題習題
- 2025年電工特種作業(yè)操作證考試試卷(電工電氣工程合同管理發(fā)展趨勢報告)
- 2023風光互補路燈設計方案
- 2023年山東省夏季普通高中學業(yè)水平合格考試會考生物試題及參考答案
- 2024年山東省青島市中考英語試卷附答案
- 2023-2024學年山東省臨沂市蘭山區(qū)八年級(下)期末數學試卷(含答案)
- 材料力學(山東聯盟-中國石油大學(華東))智慧樹知到期末考試答案章節(jié)答案2024年中國石油大學(華東)
- 江西省南昌二中心遠教育集團九灣學校2023-2024學年八年級下學期期末考試物理試題
- 深入理解Nginx(模塊開發(fā)與架構解析)
- MOOC 中國文化概論-華南師范大學 中國大學慕課答案
- 初中人教版八年級下冊期末物理真題模擬試卷經典套題
- JBT 11699-2013 高處作業(yè)吊籃安裝、拆卸、使用技術規(guī)程
- 家長會課件:初中七年級家長會課件
評論
0/150
提交評論