




全文預(yù)覽已結(jié)束
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
ASIA VITAL COMPONENTS CO., LTD.更改記錄表 The revising record listAVC 管制文件,不準(zhǔn)復(fù)印,列入移交AVC confidential, can not copyPDF created with FinePrint pdfFactory trial version 序號No.更改前章節(jié)/條款內(nèi)容Before更改後章節(jié)/條款內(nèi)容After更改後版次Revision afterAlteration提出人Proposed核準(zhǔn)人Approved生效日期EffectiveDate1新版發(fā)行 New Edition IssueA謝光平Xgp馬填順David2008/07/22文件名稱:發(fā)、配電管理辦法Doc. Name:Power Generation and Distribution Management Method版本/ Rev.:A管制印章Stamp文件編號/Doc NO.:S-AD3-WI-034頁次/Page:1/4ASIA VITAL COMPONENTS CO., LTD.1.目的 Purpose為確保公司安全供電,特制定本管理辦法。To ensure the safety of power supply, make this management method.2.適用範(fàn)圍 Applicable Scope適用於公司發(fā)、配電供電管理。Applicable for power generation & distribution management.3.職責(zé) Responsibility3.1 擔(dān)當(dāng)部門:行政部工務(wù)課Responsible department: the administration public service division3.1.1 提供給各部門的安全用電,供電電壓,三相 380 伏正負(fù) 5,頻率:50HZ,功率:0.98。Provide safe power & voltage to all dep., three-phase 380 V 5%, frequency: 50HZ, power: .2 提供及時的供電 Provide timely power1)市電供電正常時,24 小時市電供電給各用電部門。When supply normal city power, supply 24-hour normal city power to the all using departments.2)市電錯鋒用電時,啟動發(fā)電機(jī)組供電,以郵件提前一天通知各用電部門,市發(fā)電轉(zhuǎn)換時間為 10 分鐘,具體轉(zhuǎn)換時間:早上 5:30-5:40,次日 1:15-1:25。When avoid peak hour of using city power, Start power generating machine to supply power,inform all using departments by e-mail one day before changing power, changing time of Citypower is 10 minutes, specific as: 5:30 AM - 5: 40 AM, the next day 1:15 - 1: 25.3)市電在無通知突發(fā)性停電,啟動發(fā)電機(jī)組供電給各用電部門,市電轉(zhuǎn)換時間為 10 分鐘。When there is sudden power shortage without advance information, Start power generatingmachine to supply power to all using department, changing time of City power is 10 minutes.3.1.3 發(fā)電機(jī)組電力供應(yīng)不足時,擬律定分級限電計(jì)劃,依重要程度,停止供電,分級計(jì)劃如下:When power generating machine can not supply enough power, make power limit as classification;according to importance levels, the classification plan is as the following:1)一級用電:不可停電,如熱管部、資訊部、消防、安全、C1 辦公大樓等專用線路;發(fā)電機(jī)供電時,優(yōu)先供電。The first level: always with power, special lines such as heat pipe, MIS, ant fire, security, C1office buildings etc.; when the power generating machine generates power, ensure this level withpower in priority.2)二級用電:非不得己不停電,如一般生產(chǎn)用電、現(xiàn)場辦公室、警衛(wèi)室等,發(fā)電機(jī)有多餘電力時,優(yōu)先供電。The second level: only without power under special circumstances, such as the power used inmanufacture, office on-site, guards office etc.; when there is extra power, supply this level inAVC 管制文件,不準(zhǔn)復(fù)印,列入移交AVC confidential, can not copyPDF created with FinePrint pdfFactory trial version 文件名稱:發(fā)、配電管理辦法Doc. Name:Power Generation and Distribution Management Method版本/ Rev.:A管制印章Stamp文件編號/Doc NO.:S-AD3-WI-034頁次/Page:2/4ASIA VITAL COMPONENTS CO., LTD.priority.3)三級用電:於電力不足時,立即停止供電,如路燈、宿舍、空調(diào)等,發(fā)電機(jī)有多餘電力時,視狀況供電The third level: when there is no enough power, stop to supply power immediately, such as streetlamps, dormitories air condition etc., when there is extra power of the power generating machine,supply power depending on the situation.3.2 用電部門 The Power-using Department3.2.1 嚴(yán)格遵守安全用電章程。Abide the power safety constitution strictly.3.2.2 嚴(yán)禁私自拉電,各用電部門增加電源,必須向行政部門申請,審批後由工務(wù)課執(zhí)行。Forbidding using extra power without permission; if every power-using department needs to addpower-supply, they must apply with the executive department, after approval by the implementation,the Public service division implement after approval.3.2.3 供電故障後,不得私自排除故障,通知工務(wù)課由維修人員排除故障供電。When there is malfunction in the power supply system, should not troubleshoot by themselves;inform the public service division and the maintenance personnel repair it and ensure thepower-supply.3.2.4 積極配合供電人員,排除供電故障,當(dāng)供電量不夠,切除部分用電電源,保障整體供電。Cooperate with the power- supply personnel actively; solve the problem of power-supply; whenthere is not enough power, cut some power-supply, and ensure the whole power-supply system.3.3 行政部 The Administration Department3.3.1 整體供電策略的制定 Make whole plan for power-supply3.3.2 供電資源調(diào)撥,審批Allocate & approve of power resources.3.3.3 監(jiān)督及督促供電管理部門的供電安全及供電請求。Supervise and urge power-supply safety & power-supply requirements of power-supplymanagement department.4.定義 Definition無 None5.工作程序 Work Procedure5.1 制定公司內(nèi)部總電路圖,各區(qū)域平面圖。Make internal circuit diagram & the regional layout.5.2 制定有關(guān)供電設(shè)施的保養(yǎng)手冊及保養(yǎng)記錄。Make maintenance manuals and maintenance records of power supply establishment.5.3 停電記錄表。Records list of no-power.5.4 不斷對用電部門倡導(dǎo),安全用電及節(jié)約用電。AVC 管制文件,不準(zhǔn)復(fù)印,列入移交AVC confidential, can not copyPDF created with FinePrint pdfFactory trial version 文件名稱:發(fā)、配電管理辦法Doc. Name:Power Generation and Distribution Management Method版本/ Rev.:A管制印章Stamp文件編號/Doc NO.:S-AD3-WI-034頁次/Page:3/4ASIA VITAL COMPONENTS CO., LTD.Advocate using-power security and saving to power-using department continuously.5.5 值班人員安排 On duty arrangement5.5.1 電房 24 小時上班分二班制,白班 7:00-19:00 夜班 19:00-7:00,每班二人。There are 2 shifts of power room within 24 hours; day shift: 7:00-19:00, night shift: 19:00-7:00, two staffs per shift.5.5.2 制訂轉(zhuǎn)接班工作記錄表。Make shift record list.5.5.3 節(jié)假日由配電人員輪流值班,每月制訂輪流值班表。The staffs are on duty by turn on holidays, make shift duty list every month.5.5.4 值班人員每月 1 日抄各部門上月用電表數(shù),逢發(fā)電期間每小時記錄發(fā)電機(jī)運(yùn)行系數(shù)。Staffs who are on duty copy the power quantity used in last month at the first of every month,record run coefficient every hour during power generation.6.相關(guān)文件和記錄 Relevant Documents and Records6.1發(fā)電機(jī)維修記錄表(Generator Repair Record List)6.2停電記錄表(Power Failure Record List)6.3發(fā)電機(jī)運(yùn)行記錄表(Operation Record List of Generator)6.4配電櫃保養(yǎng)計(jì)劃(Electricity Distribution Cabinet Maintenance Plan)6.5配電櫃巡視檢查表(Electricity Distribution Cabinet Point Checklist)6.6市電運(yùn)
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 工會活動猜明星活動方案
- 就業(yè)人員專項(xiàng)活動方案
- 工行余額提現(xiàn)活動方案
- 盡孝揚(yáng)善活動方案
- 小班放學(xué)整隊(duì)活動方案
- 少兒閱讀創(chuàng)新活動方案
- 少先隊(duì)衛(wèi)生月活動方案
- 居委盆栽活動方案
- 工匠精神系列活動方案
- 工程公司黨建活動方案
- 2025版國家開放大學(xué)法律事務(wù)??啤稇椃▽W(xué)》期末考試總題庫
- 華中農(nóng)業(yè)大學(xué)《物聯(lián)網(wǎng)工程》2022-2023學(xué)年第一學(xué)期期末試卷
- 【MOOC】融合新聞:通往未來新聞之路-暨南大學(xué) 中國大學(xué)慕課MOOC答案
- 電信總經(jīng)理談服務(wù)
- 防雷應(yīng)急演練方案
- 半結(jié)構(gòu)化面試題100題
- 第三章更好統(tǒng)籌發(fā)展和安全的途徑和方法-國家安全教育大學(xué)生讀本教案
- 房屋及相關(guān)設(shè)施零星維修工程施工方案
- 部編版四年級語文下冊 期末詞語成語專項(xiàng)復(fù)習(xí)【含答案】
- 2025年危險(xiǎn)化學(xué)品經(jīng)營單位安全管理人員上崗證考試題庫(含答案)
- 紡織廠承包轉(zhuǎn)讓協(xié)議書范文范本
評論
0/150
提交評論